Do you have any question about this error?
Message type: E = Error
Message class: MPE_PLAN_ENG_SNPSHT - Message class for Engineering Snapshots
Message number: 023
Message text: Change record exists for all EBOM versions with target planning scope
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_PLAN_ENG_SNPSHT023
- Change record exists for all EBOM versions with target planning scope ?The SAP error message MPE_PLAN_ENG_SNPSHT023 indicates that there is a change record for all Engineering Bill of Materials (EBOM) versions within the specified target planning scope. This typically occurs during planning or when trying to execute a transaction that involves the Engineering Change Management (ECM) process.
Cause:
- Change Records Exist: The error is triggered when there are existing change records for the EBOM versions that are being processed. This means that the system has detected modifications that have not been fully processed or released.
- Planning Scope Issues: The target planning scope may include versions of the EBOM that have pending changes, which prevents the system from proceeding with the planned operation.
- Version Management: If multiple versions of the EBOM are being managed, and changes have been made to all of them, this error can arise.
Solution:
- Review Change Records: Check the change records associated with the EBOM versions in question. You can do this by navigating to the relevant transaction codes (e.g., CS02 for changing BOMs) and reviewing the change logs.
- Release or Delete Change Records: If the changes are no longer needed, you may consider deleting or releasing the change records. Ensure that you follow your organization's change management policies before doing this.
- Adjust Planning Scope: If possible, adjust the target planning scope to exclude the versions that have pending changes. This may allow you to proceed with the planning process without encountering the error.
- Consult Documentation: Refer to SAP documentation or notes related to Engineering Change Management and BOM processing for additional guidance on handling change records.
- Contact SAP Support: If the issue persists and you cannot resolve it, consider reaching out to SAP support for assistance. They may provide specific notes or patches that address this error.
Related Information:
By following these steps, you should be able to address the error and continue with your planning activities in SAP.
Get instant SAP help. Start your 7-day free trial now.
MPE_PLAN_ENG_SNPSHT021
Change record exists with the same or higher revision for the snapshot
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_ENG_SNPSHT020
Change record creation failed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_ENG_SNPSHT024
EBOM version for matl &1, plant &2, usage &3, alternative &4 not released
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_PLAN_ENG_SNPSHT025
Invalid material &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.