Do you have any question about this error?
Message type: E = Error
Message class: MPE_OAN - Operation Activity Network Messages
Message number: 307
Message text: More than one BOM item was selected for log. component &1 in operation &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MPE_OAN307
- More than one BOM item was selected for log. component &1 in operation &2 ?The SAP error message MPE_OAN307 indicates that more than one Bill of Materials (BOM) item has been selected for a log component in a specific operation. This typically occurs in the context of production planning or manufacturing processes where a component is expected to have a unique BOM item associated with it, but multiple items have been found.
Cause:
- Multiple BOM Entries: The primary cause of this error is that there are multiple BOM entries for the same component in the specified operation. This can happen if the BOM is not properly maintained or if there are duplicate entries.
- Incorrect Configuration: The configuration of the production order or routing may not be set up correctly, leading to ambiguity in which BOM item should be used.
- Data Inconsistency: There may be inconsistencies in the master data, such as the material master or BOM data, which can lead to multiple BOM items being selected.
Solution:
Check BOM Configuration:
- Go to the BOM transaction (CS03) and check the BOM for the component in question. Ensure that there is only one valid BOM entry for the component in the context of the operation.
- If there are multiple BOMs, determine which one should be used and remove or deactivate the others if they are not needed.
Review Production Order:
- Check the production order (CO02) to see how the components are assigned. Ensure that the correct BOM is being referenced in the operation.
- If necessary, reassign the correct BOM item to the operation.
Data Consistency Check:
- Run consistency checks on the BOM and material master data to identify any discrepancies. This can often be done using transaction codes like CS15 (BOM explosion) or CS12 (BOM comparison).
- Correct any inconsistencies found during the checks.
Consult Documentation:
- Review SAP documentation or help resources for any specific notes related to this error message. There may be additional context or updates that could provide further insights.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with SAP support for further assistance.
Related Information:
Transaction Codes:
SAP Notes: Check for any relevant SAP Notes that may address this specific error message or provide additional troubleshooting steps.
Documentation: Review the SAP Help Portal for detailed information on BOM management and production order processing.
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
MPE_OAN306
Operation &1 is inconsistent. See long text for details.
What causes this issue? This operation has been set to be processed externally. In addition, a cross-operation relationship exists for one or more of...
MPE_OAN305
BOM item is already assigned to logical component &1 at OA &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_OAN308
Logical component &1 not found in operation activity &2, version &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_OAN309
Auxiliary data object assignment not found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.