Message type: E = Error
Message class: MPE_OAN - Operation Activity Network Messages
Message number: 306
Message text: Operation &1 is inconsistent. See long text for details.
This operation has been set to be processed externally. In addition, a
cross-operation relationship exists for one or more of the operation
activities of the operation.
However, if an operation is to be processed externally, it is not
allowed to set any relationships for any of the operation activities of
the operation.
The system issues an error for this operation when you perform a
consistency check or try to release the routing.
If the operation is to be executed externally, delete all existing
relationships to other operations. If you want to retain the
relationships, then this operation cannot be performed externally. In
this case, change the control key assignment.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message MPE_OAN306, which states "Operation &1 is inconsistent. See long text for details," typically occurs in the context of Asset Accounting (FI-AA) or related modules when there is an inconsistency in the operation being performed on an asset. This could be due to various reasons, such as incorrect data entry, missing information, or issues with the asset master data. Possible Causes: Inconsistent Data: The operation you are trying to perform may not be valid due to missing or incorrect data in the asset master record. Incorrect Configuration: There may be configuration issues in the Asset Accounting settings that lead to inconsistencies. Transaction Errors: The transaction you are trying to execute may not be compatible with the current status of the asset (e.g., trying to retire an asset that is not fully capitalized). Authorization Issues: Lack of proper authorizations to perform the operation on the asset. System Bugs: Occasionally, bugs in the SAP system
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_OAN305 BOM item is already assigned to logical component &1 at OA &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_OAN304 Unknown logical component &1 in operation activity &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_OAN307 More than one BOM item was selected for log. component &1 in operation &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_OAN308 Logical component &1 not found in operation activity &2, version &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.