Message type: E = Error
Message class: MPE_OAN - Operation Activity Network Messages
Message number: 264
Message text: Unknown BOM assignment &1 referenced in the work instruction of OA &2 &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message MPE_OAN264 indicates that there is an issue with a Bill of Materials (BOM) assignment in the context of a work instruction. This error typically arises when the system cannot find a valid BOM assignment for the specified object in the work instruction.
Cause: Missing BOM Assignment: The BOM that is referenced in the work instruction does not exist or is not assigned to the material or operation. Incorrect Configuration: The configuration settings for the BOM or the work instruction may be incorrect or incomplete. Data Inconsistency: There may be inconsistencies in the master data, such as the material master or BOM master data. Authorization Issues: The user may not have the necessary authorizations to access the BOM or the related data.
Solution: Check BOM Assignment: Verify that the BOM exists for the material referenced in the work instruction. Ensure that the BOM is correctly assigned to the material and that it is valid for the
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_OAN263 OA &1 in OAN &2 version &3 has splits with overlapping validities
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_OAN262 Simultaneous group &1 is not allowed in non-serialized business process
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_OAN265 OA &1, version &2 referenced in qualification assignment &3 is unknown
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_OAN266 Unknown qualification &1 assigned to operation activity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.