How To Fix MPE_OAN002 - More than one end event exists in this operation activity network


MPE_OAN002 - Overview

  • Message type: E = Error

  • Message class: MPE_OAN - Operation Activity Network Messages

  • Message number: 002

  • Message text: More than one end event exists in this operation activity network

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_OAN002 - More than one end event exists in this operation activity network ?
    The SAP error message MPE_OAN002 indicates that there is an issue with the operation activity network in your project or production order. Specifically, it means that there is more than one end event defined for the operation activity network, which is not allowed. In a properly structured operation activity network, there should only be one end event to signify the completion of the operation.
    
    Cause: Multiple End Events: The primary cause of this error is the presence of multiple end events in the operation activity network. This can happen due to incorrect configuration or data entry when setting up the network. Network
    Configuration Issues: If the network was manually created or modified, it might have inadvertently included more than one end event. Data Integrity Issues: There may be inconsistencies in the data that lead to multiple end events being recognized by the system.
    Solution: To resolve the error, you can follow these steps: Review the Operation Activity

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author