How To Fix MPE_OAN001 - More than one start event exists in this operation activity network


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MPE_OAN - Operation Activity Network Messages

  • Message number: 001

  • Message text: More than one start event exists in this operation activity network

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_OAN001 - More than one start event exists in this operation activity network ?

    The SAP error message MPE_OAN001 indicates that there is an issue with the operation activity network in the context of production planning or project management. Specifically, it means that there is more than one start event defined for a particular operation activity network, which is not allowed.

    Cause:

    The error typically arises due to the following reasons:

    1. Multiple Start Events: The operation activity network has been incorrectly configured with more than one start event. In a valid network, there should only be one start event to initiate the process.
    2. Data Entry Errors: During the creation or modification of the operation activity network, multiple start events may have been inadvertently defined.
    3. Configuration Issues: There may be issues in the configuration of the network or the way the operations are linked.

    Solution:

    To resolve the error, you can take the following steps:

    1. Review the Operation Activity Network:

      • Go to the transaction code related to the operation activity network (e.g., CNO1 for creating or CNO2 for changing).
      • Check the structure of the network and identify the start events.
    2. Identify and Remove Extra Start Events:

      • Ensure that there is only one start event in the network. If you find multiple start events, determine which one should remain and remove the others.
      • You can do this by editing the network and adjusting the event assignments.
    3. Check Dependencies:

      • Review the dependencies and relationships between the activities in the network to ensure they are correctly defined.
    4. Validate Changes:

      • After making the necessary adjustments, validate the network to ensure that it is correctly configured and does not produce any errors.
    5. Consult Documentation:

      • If you are unsure about the configuration, refer to SAP documentation or guides related to operation activity networks for best practices.
    6. Seek Help from SAP Support:

      • If the issue persists after following the above steps, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CNO1, CNO2, and CNO3 for creating, changing, and displaying operation activity networks.
    • SAP Notes: Check for any SAP Notes related to this error message for additional insights or patches that may address the issue.
    • Training and Documentation: Consider training sessions or documentation on production planning and project management in SAP to better understand the configuration of operation activity networks.

    By following these steps, you should be able to resolve the MPE_OAN001 error and ensure that your operation activity network is correctly configured.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant