Message type: E = Error
Message class: MPE_INSTALLATION_MSG -
Message number: 038
Message text: Component assigned to activity without reference point
Why is it relevant
The advantage of using reference points is that you do not have to
manually assign BOM items to network activities in BOM transfer.
Possible Reasons
You manually assigned the BOM item to a network activity or (future) you
created the network directly from the BOM.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Fix
If you intend to copy networks, you should consider using reference
points to avoid having to assign BOM items manually for every end-item
unit
Error message extract from SAP system. Copyright SAP SE.
MPE_INSTALLATION_MSG038
- Component assigned to activity without reference point ?The SAP error message MPE_INSTALLATION_MSG038 indicates that a component has been assigned to an activity without a reference point. This typically occurs in the context of maintenance planning or project management within SAP, where components (like materials or resources) need to be linked to specific reference points (like locations, equipment, or other relevant entities) to ensure proper tracking and management.
Cause: Missing Reference Point: The component is assigned to an activity, but there is no defined reference point (e.g., equipment, functional location) associated with that activity.
Configuration Issues: There may be issues in the configuration of the maintenance plan or project structure that prevent the proper assignment of reference points. Data Entry Errors: Incorrect or incomplete data entry when assigning components to activities can lead to this error.
Solution: Check Activity Assignment: Review the activity to ensure that it has a valid reference point assigned. This can usually be done in the maintenance order or project
Get instant SAP help. Sign up for our Free Essentials Plan.
MPE_INSTALLATION_MSG037
Referenced activity does not exist
What causes this issue? Why is it relevant? Every demand for an installation kit should be assigned to a network activity to define the sequence in w...
MPE_INSTALLATION_MSG036
Component not assigned to activity
What causes this issue? Why is it relevant? Every demand for an installation kit should be assigned to a network activity to define the sequence in w...
MPE_INSTALLATION_MSG039
Component assigned to activity with wrong reference point
What causes this issue? Why is it relevant? Reference points serve the assignment of BOM items to network activities. The component demand (reservati...
MPE_INSTALLATION_MSG040
Duration in network activity & and material master & differs
What causes this issue? The network and material master have been created independently.System Response This app allows to create network activities...
Click on this link to search all SAP messages.