How To Fix MPE_INSTALLATION_MSG038 - Component assigned to activity without reference point


MPE_INSTALLATION_MSG038 - Overview

  • Message type: E = Error

  • Message class: MPE_INSTALLATION_MSG -

  • Message number: 038

  • Message text: Component assigned to activity without reference point

  • Show details Hide details
  • What causes this issue?

    Why is it relevant
    The advantage of using reference points is that you do not have to
    manually assign BOM items to network activities in BOM transfer.
    Possible Reasons
    You manually assigned the BOM item to a network activity or (future) you
    created the network directly from the BOM.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Fix
    If you intend to copy networks, you should consider using reference
    points to avoid having to assign BOM items manually for every end-item
    unit

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MPE_INSTALLATION_MSG038 - Component assigned to activity without reference point ?
    The SAP error message MPE_INSTALLATION_MSG038 indicates that a component has been assigned to an activity without a reference point. This typically occurs in the context of maintenance planning or project management within SAP, where components (like materials or resources) need to be linked to specific reference points (like locations, equipment, or other relevant entities) to ensure proper tracking and management.
    
    Cause: Missing Reference Point: The component is assigned to an activity, but there is no defined reference point (e.g., equipment, functional location) associated with that activity.
    Configuration Issues: There may be issues in the configuration of the maintenance plan or project structure that prevent the proper assignment of reference points. Data Entry Errors: Incorrect or incomplete data entry when assigning components to activities can lead to this error.
    Solution: Check Activity Assignment: Review the activity to ensure that it has a valid reference point assigned. This can usually be done in the maintenance order or project

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant