Do you have any question about this error?
Message type: E = Error
Message class: MPE_CM_EFFECTIVITY - Message Class for Parameter Effectivity
Message number: 080
Message text: Overall Effectivity of the BOM &1 does not cover it's usage in other BOMs
The revised overall effectivity of the BOM, due to the changes in
the effectivity of the components, does not cover it's usage effectivity
in other BOMs.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Adjust Component Effectivity.
Error message extract from SAP system. Copyright SAP SE.
MPE_CM_EFFECTIVITY080
- Overall Effectivity of the BOM &1 does not cover it's usage in other BOMs ?The SAP error message MPE_CM_EFFECTIVITY080 indicates that there is an issue with the overall effectivity of a Bill of Materials (BOM) in relation to its usage in other BOMs. This typically occurs when the effectivity dates or conditions of a BOM do not align with the requirements of other BOMs that reference it.
Cause:
- Effectivity Dates: The BOM in question may have effectivity dates that do not cover the periods during which it is being used in other BOMs.
- Usage in Other BOMs: The BOM might be referenced in other BOMs that have different effectivity requirements, leading to a mismatch.
- Configuration Issues: There may be configuration issues in the way effectivity is set up in the system, such as incorrect settings for the BOM or the materials involved.
- Master Data Issues: The master data for the materials or BOMs may not be correctly maintained, leading to inconsistencies.
Solution:
- Check Effectivity Dates: Review the effectivity dates of the BOM in question and ensure they cover all the periods during which the BOM is referenced in other BOMs.
- Adjust BOMs: If necessary, adjust the effectivity dates of the BOM or the referencing BOMs to ensure they align correctly.
- Review BOM Structure: Check the structure of the BOMs to ensure that they are correctly defined and that there are no discrepancies in the way they reference each other.
- Update Master Data: Ensure that all relevant master data is up to date and correctly maintained, including material master records and BOM records.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing BOM effectivity and resolving related issues.
Related Information:
By following these steps, you should be able to resolve the MPE_CM_EFFECTIVITY080 error and ensure that your BOMs are correctly aligned in terms of effectivity.
Get instant SAP help. Start your 7-day free trial now.
MPE_CM_EFFECTIVITY079
BOM header quantity for material &1 must be 1
What causes this issue? BOM header quantity for material &V1& must be 1 because it is of Complex Assembly Type Major Assemblies.System Respon...
MPE_CM_EFFECTIVITY078
BOM item quantity for material &1 must be 1
What causes this issue? BOM item quantity for material &V1& must be 1 because it is of Complex Assembly Type Installation Kit. The system iss...
MPE_CM_EFFECTIVITY081
Usage Effectivity of the component &1 is not allowed
What causes this issue? The revised usage effectivity of the component is not covered by the sub-assembly's overall effectivity.System Response ...
MPE_CM_EFFECTIVITY082
Effectivity Type &1 cannot be used to create ECNs using this application
What causes this issue? Effectivity Type &V1& cannot be used to create ECNs using this application The system issues an error message and wil...
Click on this link to search all SAP messages.