Do you have any question about this error?
Message type: E = Error
Message class: MPE_CM_EFFECTIVITY - Message Class for Parameter Effectivity
Message number: 079
Message text: BOM header quantity for material &1 must be 1
BOM header quantity for material &V1& must be 1 because it is
of Complex Assembly Type Major Assemblies.
If the material type of material is identified as Major Assemblies
then the quantity of such BOM header should always be 1 because
Major Assemblies with multiple quantity is not supported.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
MPE_CM_EFFECTIVITY079
- BOM header quantity for material &1 must be 1 ?The SAP error message MPE_CM_EFFECTIVITY079 indicates that there is an issue with the Bill of Materials (BOM) header quantity for a specific material. The error message states that the BOM header quantity must be set to 1. This typically occurs in the context of configuring or managing BOMs in SAP, particularly when dealing with configurable materials.
Cause:
The error is triggered when the BOM header quantity for a material is not set to 1. In SAP, BOMs are used to define the components that make up a product, and the header quantity specifies how many units of the BOM are being defined. If this quantity is anything other than 1, it can lead to inconsistencies or errors in the configuration of the material.
Solution:
To resolve this error, you need to check and correct the BOM header quantity for the affected material. Here are the steps to do this:
Access the BOM:
- Go to the transaction code CS02 (Change BOM) or CS01 (Create BOM) in SAP.
Enter Material Information:
- Input the material number and the plant for which the BOM is defined.
Check BOM Header:
- Once you are in the BOM screen, check the header details. Look for the field that specifies the BOM header quantity.
Set Header Quantity to 1:
- Change the BOM header quantity to 1 if it is currently set to a different value.
Save Changes:
- After making the necessary changes, save the BOM.
Test the Configuration:
- After saving, try to perform the action that previously triggered the error to ensure that it has been resolved.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP Notes for any known issues related to this error message.
Get instant SAP help. Start your 7-day free trial now.
MPE_CM_EFFECTIVITY078
BOM item quantity for material &1 must be 1
What causes this issue? BOM item quantity for material &V1& must be 1 because it is of Complex Assembly Type Installation Kit. The system iss...
MPE_CM_EFFECTIVITY077
No Authorization to make changes
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MPE_CM_EFFECTIVITY080
Overall Effectivity of the BOM &1 does not cover it's usage in other BOMs
What causes this issue? The revised overall effectivity of the BOM, due to the changes in the effectivity of the components, does not cover it's...
MPE_CM_EFFECTIVITY081
Usage Effectivity of the component &1 is not allowed
What causes this issue? The revised usage effectivity of the component is not covered by the sub-assembly's overall effectivity.System Response ...
Click on this link to search all SAP messages.