Message type: E = Error
Message class: MMRP01 - Rapid Planning Matrix
Message number: 212
Message text: Error scheduling horizon for detailed scheduling using production calend.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MMRP01212
- Error scheduling horizon for detailed scheduling using production calend. ?The SAP error message MMRP01212, which indicates an issue with the "Error scheduling horizon for detailed scheduling using production calendar," typically arises in the context of production planning and detailed scheduling within SAP's Advanced Planning and Optimization (APO) or Production Planning (PP) modules. This error suggests that there is a problem with the scheduling horizon defined in the production calendar.
Cause:
- Incorrect Production Calendar Settings: The production calendar may not be set up correctly, or the scheduling horizon may not align with the defined working days and times.
- Scheduling Horizon Configuration: The scheduling horizon might be set too short or too long, leading to conflicts with the production calendar.
- Master Data Issues: There may be inconsistencies or missing data in the master data related to the production resources, such as work centers or production versions.
- Capacity Constraints: If the capacity of the resources is not sufficient to meet the demand within the defined scheduling horizon, this error can occur.
- Planning Version Issues: The planning version being used may not be correctly configured or may not have the necessary data.
Solution:
Check Production Calendar: Verify the production calendar settings in the system. Ensure that the working days and times are correctly defined and that they align with the scheduling horizon.
- Transaction Code:
SCAL
(for checking and maintaining production calendars).Adjust Scheduling Horizon: Review and adjust the scheduling horizon settings in the detailed scheduling profile.
- Transaction Code:
SPRO
(to access the configuration settings).- Navigate to:
Advanced Planning and Optimization
>Global Settings
>Detailed Scheduling
>Define Scheduling Horizon
.Review Master Data: Ensure that all relevant master data (work centers, production versions, etc.) is correctly maintained and that there are no inconsistencies.
- Transaction Codes:
CR01
(Create Work Center),C202
(Change Production Version).Check Capacity Planning: Analyze the capacity of the resources involved in the production process. Ensure that there is enough capacity to meet the demand within the scheduling horizon.
- Transaction Code:
CM01
(Capacity Planning).Validate Planning Version: Ensure that the planning version being used is correctly set up and contains all necessary data for the scheduling process.
- Transaction Code:
SCC4
(to check client settings).Run Consistency Checks: Use the consistency check tools available in SAP to identify any discrepancies in the planning data.
Related Information:
By following these steps, you should be able to identify the root cause of the MMRP01212 error and implement the necessary corrections to resolve it.
Get instant SAP help. Start your 7-day free trial now.
MMRP01211
You have not assigned a production calendar to location &1
What causes this issue? In order to carry out fixing you must assign a <DS:DE./SAPAPO/PPCAL>production calendar</> to location &V1&am...
MMRP01210
'Explode Det.Scheduling Matrix Only' is not possible for product &1 in &2
What causes this issue? You have selected the function to <DS:DE.MMRP_FP_EXPLOSION> explode orders from the detailed scheduling matrix only<...
MMRP01213
Product &1 does not exist in the location
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MMRP01214
Variant &2 is assigned several times to line segment &1
What causes this issue? Component variant &V2& has been assigned several times to line segment &V1&.System Response The Rapid Planni...