How To Fix MMRP01212 - Error scheduling horizon for detailed scheduling using production calend.


MMRP01212 - Overview

  • Message type: E = Error

  • Message class: MMRP01 - Rapid Planning Matrix

  • Message number: 212

  • Message text: Error scheduling horizon for detailed scheduling using production calend.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


MMRP01212 - Details

  • The SAP error message MMRP01212, which indicates an issue with the "Error scheduling horizon for detailed scheduling using production calendar," typically arises in the context of production planning and detailed scheduling within SAP's Advanced Planning and Optimization (APO) or Production Planning (PP) modules. This error suggests that there is a problem with the scheduling horizon defined in the production calendar.
    
    Cause: Incorrect Production Calendar Settings: The production calendar may not be set up correctly, or the scheduling horizon may not align with the defined working days and times. Scheduling Horizon Configuration: The scheduling horizon might be set too short or too long, leading to conflicts with the production calendar. Master Data Issues: There may be inconsistencies or missing data in the master data related to the production resources, such as work centers or production versions. Capacity Constraints: If the capacity of the resources is not sufficient to meet the demand within the defined scheduling horizon,

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


MMRP01212 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker