Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix MM_PUR_SRCGPROJ083 - Phase switching is not permitted for draft entries.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MM_PUR_SRCGPROJ - Message class of MM PUR Sourcing Project

  • Message number: 083

  • Message text: Phase switching is not permitted for draft entries.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MM_PUR_SRCGPROJ083 - Phase switching is not permitted for draft entries. ?

    The SAP error message MM_PUR_SRCGPROJ083 indicates that there is an issue with switching phases for draft entries in the context of sourcing projects. This typically occurs in the SAP Materials Management (MM) module, particularly when dealing with sourcing projects or procurement processes.

    Cause:

    The error arises when there is an attempt to change the phase of a draft entry that is not allowed. In SAP, draft entries are often used for preliminary data that has not yet been finalized. The system restricts certain actions on draft entries to prevent inconsistencies or errors in the procurement process.

    Solution:

    To resolve this error, consider the following steps:

    1. Check Draft Status: Ensure that the entry you are trying to modify is not in a draft status. If it is, you may need to finalize or release the draft before attempting to switch phases.

    2. Finalize the Draft: If you need to proceed with the entry, finalize it by saving or completing the draft. This may involve filling in all required fields and ensuring that the entry meets all necessary criteria.

    3. Review Configuration: If you believe that the phase switching should be allowed for draft entries, review the configuration settings in your SAP system. Consult with your SAP administrator or functional consultant to ensure that the system settings align with your business processes.

    4. Consult Documentation: Refer to SAP documentation or help resources for more detailed information on the specific transaction or process you are working with. This can provide insights into any restrictions or requirements related to draft entries.

    5. Error Logs: Check the error logs or system messages for additional context or related errors that may provide further clues about the issue.

    6. Contact Support: If the issue persists and you cannot find a resolution, consider reaching out to SAP support or your internal IT support team for assistance.

    Related Information:

    • SAP Notes: Look for relevant SAP Notes that may address this specific error or provide patches or updates that could resolve the issue.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.
    • Training: If you frequently encounter issues with draft entries, consider additional training on the procurement processes within SAP to better understand how to manage drafts and phases effectively.

    By following these steps, you should be able to address the MM_PUR_SRCGPROJ083 error and continue with your procurement activities in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker