How To Fix ME823 - Rescheduling for material &1 failed


ME823 - Overview

  • Message type: E = Error

  • Message class: ME - Purchasing: General Messages

  • Message number: 823

  • Message text: Rescheduling for material &1 failed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message ME823 - Rescheduling for material &1 failed ?
    The SAP error message ME823, which states "Rescheduling for material &1 failed," typically occurs in the context of materials management and production planning. This error indicates that the system was unable to reschedule a material due to various reasons. Here are some common causes, potential solutions, and related information:
    Causes:
    
    Missing or Incorrect Data: The material master data or the production order data may be incomplete or incorrect.
    Locked Objects: The material or related objects may be locked by another user or process, preventing rescheduling.
    Scheduling Conflicts: There may be conflicts in the scheduling parameters, such as capacity constraints or availability of resources.
    Dependencies and Constraints: There may be dependencies or constraints in the production process that prevent rescheduling.
    Planning Parameters: Incorrect planning parameters or settings in the configuration may lead to this error.
    
    Solutions:
    
    Check Material Master Data: Ensure that the material master data is complete and accurate. Verify that all necessary fields are filled out correctly.
    Unlock

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker