Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 505
Message text: &1: Move operation to component level (U2)
The rescheduling check has determined that the receipts for the
components should be changed to avoid excessive warehouse stock at the
wrong time.
This exception message appears in the MRP list for a planning run in
the main memory.
Check whether the receipts for the components are to be changed. You
can access these receipts by choosing the function 'Order structure'
for the receipt currently viewed.
Error message extract from SAP system. Copyright SAP SE.
MD505
- &1: Move operation to component level (U2) ?The SAP error message MD505 typically indicates an issue related to the movement of stock in the system, particularly when dealing with component levels in a production or inventory context. The error message "Move operation to component level (U2)" suggests that there is a problem with the movement of materials or components in the system, often related to the configuration of the material master or the production order.
Cause:
- Incorrect Configuration: The material master or the production order may not be configured correctly, leading to issues when trying to move stock.
- Stock Levels: There may be insufficient stock available at the component level to fulfill the move operation.
- Document Type Issues: The document type used for the movement may not be set up correctly in the system.
- Batch Management: If batch management is enabled, there may be issues with batch determination or availability.
- Authorization Issues: The user may not have the necessary authorizations to perform the move operation.
Solution:
- Check Material Master: Verify the configuration of the material master for the components involved. Ensure that all necessary data is correctly maintained.
- Review Stock Levels: Check the stock levels of the components to ensure that there is enough stock available for the move operation.
- Document Type Configuration: Ensure that the document type used for the movement is correctly configured in the system.
- Batch Management: If applicable, check the batch management settings and ensure that the correct batches are available for the move operation.
- User Authorizations: Verify that the user has the necessary authorizations to perform the move operation. If not, contact your SAP security team to adjust the authorizations.
- Transaction Logs: Review transaction logs for any additional error messages or warnings that may provide more context on the issue.
Related Information:
By following these steps, you should be able to identify and resolve the issue causing the MD505 error message in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
MD504
&1: Preference for operation at component level (U1)
What causes this issue? The rescheduling check has calculated that the receipts of the components are not available until too late of a date. The del...
MD503
&1: Finish date of components in past (T4)
What causes this issue? The finish date of the order proposals for the components is in the past.System Response This exception message appears in t...
MD510
Overflow: More than 9999 items in BOM recursive for BOM &?
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD511
Could not explode phantom assembly &1
What causes this issue? The system could not explode one or more phantom assemblies when exploding the order BOM. Although there are BOMs for these p...
Click on this link to search all SAP messages.