Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 424
Message text: &1: &2 (P1)
The scheduling data in the Customizing settings are not consistent for
the material.
Possible reasons, for example:
detailed scheduling selected, but no suitable entry exists for
'Parameters of detailed scheduling'
selection ID that no longer exists entered in Customizing
The exception is displayed in the MRP list and in the current
stock/requirements list.
Check the settings in Customizing in MRP (scheduling levels, selection
ID for routing selection and the parameters for detailed scheduling).
Error message extract from SAP system. Copyright SAP SE.
MD424
- &1: &2 (P1) ?The SAP error message MD424 typically relates to issues in the Material Requirements Planning (MRP) process, specifically concerning the planning of materials. The message format you provided indicates that there are two placeholders (&1 and &2) that would be filled with specific information relevant to the error.
Cause:
The MD424 error message usually indicates that there is a problem with the planning situation of a material. Common causes include:
- Missing Master Data: The material master data may be incomplete or missing essential information, such as MRP type, lot size, or procurement type.
- Incorrect MRP Settings: The settings for MRP might not be configured correctly for the material in question.
- Stock Levels: There may be issues with stock levels, such as negative stock or stock that is not available for planning.
- Planning File Entries: The planning file entries for the material may not be updated or may be missing.
- Dependencies: There could be dependencies or constraints in the BOM (Bill of Materials) or routing that are not being met.
Solution:
To resolve the MD424 error, you can take the following steps:
- Check Material Master Data: Ensure that the material master data is complete and correctly configured. Pay special attention to the MRP views.
- Review MRP Settings: Verify the MRP settings for the material, including MRP type, lot size, and procurement type.
- Analyze Stock Levels: Check the stock levels for the material to ensure that they are correct and that there are no negative stocks.
- Update Planning File: If necessary, run the planning file update to ensure that the planning file entries are current.
- Check BOM and Routing: Review the BOM and routing for the material to ensure that all dependencies are satisfied.
- Run MRP Again: After making the necessary corrections, run the MRP process again to see if the error persists.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP community forums for additional assistance.
Get instant SAP help. Start your 7-day free trial now.
MD423
&1: &2 (U5)
What causes this issue? The planned available stock is greater than the maximum stock as specified by the range of coverage profile.System Response ...
MD422
&1: &2 &3 (U4)
What causes this issue? For one of the following reasons, the (non-fixed) order proposal could not be planned on time: On the basis of backward sched...
MD425
&1: &2 (P2)
What causes this issue? The system could not find a valid routing when scheduling via the routing or the routing is incorrect.System Response This e...
MD426
&1: &2 (P3)
What causes this issue? In Customizing, no specification has been made to allow the adjustment of the order start date to the production start date. ...