How To Fix MD421 - &1: &2 &3 (U3)


MD421 - Overview

  • Message type: E = Error

  • Message class: MD - Material Requirements Planning (MRP)

  • Message number: 421

  • Message text: &1: &2 &3 (U3)

  • Show details Hide details
  • What causes this issue?

    There is no requirements for this receipt. It should be reversed to
    avoid unnecessary warehouse stock.

    System Response

    This exception is displayed in the MRP list, and in the
    stock/requirements list.

    How to fix this error?

    Check whether the receipt can be reversed.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MD421 - &1: &2 &3 (U3) ?
    The SAP error message MD421 typically relates to issues in the Material Requirements Planning (MRP) process, specifically when there are problems with the availability of materials or the planning of production orders. The message format you provided indicates that it is a warning or error related to the MRP run.
    
    Cause: The error message MD421 usually indicates that there is a problem with the availability of materials for a specific production order or planned order. The placeholders &1, &2, and &3 in the message represent specific details about the error, such as: &1: The material number &2: The plant or location &3: Additional information or context about the error Common causes for this error include: Insufficient stock of the material. Incorrect planning parameters. Issues with the bill of materials (BOM) or routing. MRP settings that do not align with the production requirements.
    Solution: To resolve the MD421 error, you can take the following steps: Check Material Availability: Verify the stock levels of the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:
  • MD420 &1: &2 &3 (U2)
    What causes this issue? In the rescheduling check, the system calculated a date to which the receipt is to be moved out (rescheduled out) to avoid hi...

  • MD419 &1: &2 &3 (U1)
    What causes this issue? In the rescheduling check, the system calculated a date to which the receipt is to be brought forward (rescheduled in) to avo...

  • MD422 &1: &2 &3 (U4)
    What causes this issue? For one of the following reasons, the (non-fixed) order proposal could not be planned on time: On the basis of backward sched...

  • MD423 &1: &2 (U5)
    What causes this issue? The planned available stock is greater than the maximum stock as specified by the range of coverage profile.System Response ...

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker