Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 420
Message text: &1: &2 &3 (U2)
In the rescheduling check, the system calculated a date to which the
receipt is to be moved out (rescheduled out) to avoid high warehouse
stock at the wrong time.
The date displayed is the date by which the receipt is to be available
for MRP. This includes the goods receipt processing time. If this is not
zero, this is displayed as well as the required goods receipt date.
This exception is displayed in the MRP list, and in the
stock/requirements list.
Check whether the receipt can be postponed.
Error message extract from SAP system. Copyright SAP SE.
MD420
- &1: &2 &3 (U2) ?The SAP error message MD420 typically relates to issues in the Material Requirements Planning (MRP) process, specifically when there are problems with the planning of materials. The message format you provided indicates that it includes placeholders for specific details, which can vary based on the context of the error.
Cause:
The error message MD420 usually indicates that there is a problem with the planning run, such as:
- Missing Master Data: The material master data or BOM (Bill of Materials) might be incomplete or missing.
- Incorrect MRP Parameters: The MRP parameters for the material might not be set correctly.
- Stock Issues: There may be issues with stock levels, such as negative stock or stock not being available for the planned order.
- Planning File Entries: There could be issues with the planning file entries that prevent the MRP run from processing correctly.
- Configuration Issues: There may be configuration issues in the MRP settings that need to be addressed.
Solution:
To resolve the MD420 error, you can take the following steps:
Check Material Master Data: Ensure that the material master data is complete and correctly configured. This includes checking the MRP views and ensuring that all necessary fields are filled out.
Review BOM and Routing: If applicable, check the BOM and routing for the material to ensure they are correctly defined and available.
Verify MRP Parameters: Check the MRP parameters for the material in the material master to ensure they are set correctly for your planning needs.
Check Stock Levels: Review the stock levels for the material to ensure that there are no discrepancies, such as negative stock.
Analyze Planning File Entries: Use transaction code MD21 to check the planning file entries for the material and ensure they are correct.
Run MRP Again: After making the necessary corrections, run the MRP process again to see if the error persists.
Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
MD419
&1: &2 &3 (U1)
What causes this issue? In the rescheduling check, the system calculated a date to which the receipt is to be brought forward (rescheduled in) to avo...
MD418
&1: &2 &3 (V3)
What causes this issue? The order proposal was manually changed in the single-item planning run. The system issues an error message and will not allo...
MD421
&1: &2 &3 (U3)
What causes this issue? There is no requirements for this receipt. It should be reversed to avoid unnecessary warehouse stock.System Response This e...
MD422
&1: &2 &3 (U4)
What causes this issue? For one of the following reasons, the (non-fixed) order proposal could not be planned on time: On the basis of backward sched...
Click on this link to search all SAP messages.