Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 409
Message text: &1: &2 (S3)
No valid run schedule header could be selected for the planned order
(run schedule quantity) of a material that is planned in repetitive
manufacturing.
No run schedule header is assigned.
This exception is set in the MRP list.
Check the validity of the run schedule headers for material and
production version.
Error message extract from SAP system. Copyright SAP SE.
MD409
- &1: &2 (S3) ?The SAP error message MD409 typically relates to issues in the Material Requirements Planning (MRP) process, specifically concerning the availability of materials or the planning of production orders. The message format usually indicates that there is a problem with the planning situation for a specific material or component.
Cause:
The error message MD409 can occur due to several reasons, including:
- Insufficient Stock: The system may not have enough stock of the required materials to fulfill the demand.
- Incorrect Planning Parameters: The planning parameters for the material may not be set correctly, leading to incorrect calculations.
- Missing Master Data: Essential master data (like BOM, routing, or material master) may be incomplete or incorrect.
- Planning File Entries: There may be issues with the planning file entries that prevent the system from processing the requirements correctly.
- Production Order Issues: If there are production orders that are not properly set up or released, it can lead to this error.
Solution:
To resolve the MD409 error, you can take the following steps:
- Check Stock Levels: Verify the stock levels of the materials involved. Ensure that there is enough stock to meet the demand.
- Review Planning Parameters: Check the planning parameters in the material master (MRP views) to ensure they are set correctly.
- Validate Master Data: Ensure that all relevant master data (BOM, routing, material master) is complete and accurate.
- Analyze Planning File Entries: Use transaction code MD21 to check the planning file entries and ensure they are correctly set up.
- Check Production Orders: Review any production orders related to the material to ensure they are properly configured and released.
- Run MRP Again: After making necessary adjustments, run the MRP process again to see if the error persists.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in MRP processes.
Get instant SAP help. Start your 7-day free trial now.
MD408
&1: &2 (S2)
What causes this issue? No valid BOM could be selected for the planned order.System Response BOM explosion cannot be executed. The conversion indica...
MD407
&1: &2 (S1)
What causes this issue? No BOM exists for the material or for the sales order for the process with sales order BOM.System Response BOM explosion can...
MD410
&1: &2 (S6)
What causes this issue? This exception message is set in the MRP list if a requirement exists outwith the effective out date for a part to be discont...
MD411
&1: &2 (S7)
What causes this issue? In the MRP list, this exception message is set if an shortage occurs within the planning time fence for a material with fixin...
Click on this link to search all SAP messages.