Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MD313
- Capacity for planned order has been scheduled ?The SAP error message MD313 indicates that the capacity for a planned order has been scheduled, but there are issues that prevent the planned order from being processed as expected. This error typically arises in the context of production planning and capacity management within SAP.
Cause:
- Capacity Constraints: The planned order may exceed the available capacity of the work center or production line. This can happen if there are other orders scheduled at the same time or if the work center is not available due to maintenance or other reasons.
- Incorrect Planning Parameters: The planning parameters for the material or work center may not be set correctly, leading to scheduling conflicts.
- Resource Availability: The resources (machines, labor, etc.) required for the planned order may not be available during the scheduled time.
- Order Overlap: There may be overlapping orders that are scheduled for the same work center, causing a conflict in capacity.
Solution:
- Check Capacity Availability: Review the capacity of the work center in question. You can do this by using transaction codes like CM01 (Capacity Planning) or CM21 (Capacity Leveling) to analyze the load on the work center.
- Adjust Scheduling: If the capacity is indeed constrained, consider rescheduling the planned order to a time when capacity is available. This can be done by adjusting the start and finish dates of the planned order.
- Modify Planning Parameters: Ensure that the planning parameters for the material and work center are set correctly. This includes lead times, setup times, and processing times.
- Review Resource Allocation: Check if the necessary resources are available and not allocated to other orders. If they are, you may need to adjust the resource allocation or find alternative resources.
- Use Capacity Planning Tools: Utilize SAP's capacity planning tools to identify and resolve capacity issues. This may involve leveling the load across different work centers or shifting orders to different time slots.
- Consult with Production Planning Team: If the issue persists, it may be beneficial to consult with the production planning team to understand the broader context of the scheduling and capacity issues.
Related Information:
By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the MD313 error and ensure smooth production planning processes.
Get instant SAP help. Start your 7-day free trial now.
MD312
No periods exist with overload
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD311
Period & was not found
What causes this issue? The period specified does not exist in the period of evaluation.System Response The system issues an error message and will ...
MD314
The scrap quantity was adjusted proportionally
What causes this issue? The order quantity was change from &V1& to &V2&. As a result, the scrap quantity was adjusted proportionally ...
MD315
Please enter start and finish date
What causes this issue? If you want to specify an evaluation period, that differs from the period defined in the profile, you must enter the start an...
Click on this link to search all SAP messages.