Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 312
Message text: No periods exist with overload
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MD312
- No periods exist with overload ?The SAP error message MD312 "No periods exist with overload" typically occurs in the context of Material Requirements Planning (MRP) when the system is unable to find any planning periods that meet the criteria for the overload situation. This can happen for various reasons, and understanding the cause and potential solutions is essential for resolving the issue.
Causes:
- No Planning Periods Defined: The planning horizon may not be set up correctly, or there may be no planning periods defined for the material in question.
- Incorrect MRP Settings: The MRP settings for the material or plant may not be configured properly, leading to the system not recognizing any valid periods.
- Data Inconsistencies: There may be inconsistencies in the master data, such as the material master or the MRP area settings.
- Overload Configuration: The overload configuration might not be set up correctly, or the criteria for overload may not be met for the defined periods.
- Time Periods Not Open: The time periods for planning may not be open or available for the MRP run.
Solutions:
- Check Planning Periods: Verify that the planning periods are correctly defined in the system. You can do this by checking the MRP settings for the material and ensuring that the planning horizon is set appropriately.
- Review MRP Settings: Go to the material master (transaction MM03) and check the MRP views. Ensure that the MRP type, lot size, and other relevant settings are correctly configured.
- Validate Master Data: Ensure that the material master data is complete and consistent. Check for any missing or incorrect entries that could affect MRP processing.
- Adjust Overload Configuration: Review the overload settings in the system. Make sure that the criteria for overload are correctly defined and that they align with the planning periods.
- Open Time Periods: If the planning periods are closed, you may need to open them. This can typically be done in the MRP settings or through specific configuration transactions.
- Run MRP Again: After making the necessary adjustments, run the MRP process again to see if the error persists.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in MRP processes.
Get instant SAP help. Start your 7-day free trial now.
MD311
Period & was not found
What causes this issue? The period specified does not exist in the period of evaluation.System Response The system issues an error message and will ...
MD310
No planning calendar exists for the material
What causes this issue? You have not specified a planning calendar either in Customizing for MRP (period totals) nor in the material master record.Sy...
MD313
Capacity for planned order has been scheduled
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD314
The scrap quantity was adjusted proportionally
What causes this issue? The order quantity was change from &V1& to &V2&. As a result, the scrap quantity was adjusted proportionally ...
Click on this link to search all SAP messages.