Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 250
Message text: *****COMMENT: Messages for parallel MRP
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MD250
- *****COMMENT: Messages for parallel MRP ?The SAP error message MD250 is related to the Material Requirements Planning (MRP) process. This message typically indicates that there are issues with the parallel processing of MRP runs. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Parallel Processing Configuration: The error may arise if the parallel processing settings for MRP are not configured correctly. This can happen if the system is unable to allocate resources for parallel processing.
- Locking Issues: If multiple MRP runs are trying to access the same data simultaneously, it can lead to locking issues, causing the error.
- System Performance: High system load or performance issues can also lead to problems with parallel processing.
- Data Consistency: Inconsistencies in master data or transaction data can lead to errors during the MRP run.
Solutions:
- Check Configuration: Review the configuration settings for parallel processing in MRP. Ensure that the settings are appropriate for your system's capabilities.
- Transaction Code:
OMMR
(for MRP configuration)- Monitor System Load: Check the system performance and load during the MRP run. If the system is under heavy load, consider scheduling MRP runs during off-peak hours.
- Review Lock Entries: Use transaction code
SM12
to check for any lock entries that may be causing issues. If necessary, release locks that are no longer needed.- Run MRP in Single-Processing Mode: As a temporary workaround, you can run MRP in single-processing mode to avoid parallel processing issues.
- Transaction Code:
MD01
(for MRP run)- Check for Data Issues: Ensure that all relevant master data (material master, BOM, etc.) and transaction data (purchase orders, production orders) are consistent and correctly maintained.
- SAP Notes: Check for any relevant SAP Notes that may address this specific error. SAP frequently releases updates and patches that can resolve known issues.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP Basis team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
MD212
Please enter a planning scenario
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD211
Version &2 is not maintained for fiscal year &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MD251
Please check the destinations for parallel MRP
What causes this issue? No destinations have been entered in Customizing or none of the the destinations (application server) entered are active. In ...
MD252
Total planning run stopped due to &1 terminations (dumps) of &2 materials
What causes this issue? The total planning run was stopped as out of &V2& materials planned, &V1& were terminated with a runtime erro...
Click on this link to search all SAP messages.