How To Fix MA403 - Calculation: single-level = "1" - multi-level = "2"


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MA - Sales and Operations Planning

  • Message number: 403

  • Message text: Calculation: single-level = "1" - multi-level = "2"

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message MA403 - Calculation: single-level = "1" - multi-level = "2" ?

    The SAP error message MA403, which states "Calculation: single-level = '1' - multi-level = '2'", typically occurs in the context of Material Requirements Planning (MRP) or when dealing with material master data in SAP. This error indicates a discrepancy between the single-level and multi-level planning settings for a material.

    Cause:

    1. Configuration Issue: The error often arises when there is a mismatch in the configuration settings for single-level and multi-level planning. This can happen if the material is set up for single-level planning but is being processed in a multi-level context, or vice versa.
    2. Material Master Data: The material master data may not be correctly configured for the type of planning you are trying to execute. For example, if a material is marked for multi-level planning but is being treated as a single-level material, this error can occur.
    3. MRP Type: The MRP type assigned to the material may not be compatible with the planning strategy being used.

    Solution:

    1. Check Material Master Settings:

      • Go to the material master record (transaction code MM03) and check the MRP views. Ensure that the settings for MRP type, planning strategy, and other relevant fields are correctly configured.
      • Verify that the material is set up for the appropriate planning level (single-level or multi-level) based on your requirements.
    2. Review MRP Configuration:

      • Check the configuration settings in the MRP area (transaction code OMD0) to ensure that the settings for single-level and multi-level planning are consistent and correctly defined.
      • Ensure that the MRP type assigned to the material is appropriate for the planning strategy you intend to use.
    3. Run MRP Again: After making the necessary adjustments, try running the MRP process again to see if the error persists.

    4. Consult Documentation: If the issue continues, refer to SAP documentation or consult with your SAP support team for further assistance. They may provide insights specific to your system configuration.

    Related Information:

    • Transaction Codes:
      • MM03: Display Material Master
      • OMD0: MRP Configuration
      • MD01: MRP Run
    • MRP Types: Familiarize yourself with different MRP types (e.g., PD, VB, etc.) and their implications on planning.
    • Planning Strategies: Understand the various planning strategies (e.g., Make-to-Stock, Make-to-Order) and how they affect material planning.

    By addressing the configuration and ensuring that the material master data aligns with your planning requirements, you should be able to resolve the MA403 error.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author