Do you have any question about this error?
Message type: E = Error
Message class: MA - Sales and Operations Planning
Message number: 103
Message text: Specified period comes after planning finish
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
MA103
- Specified period comes after planning finish ?The SAP error message MA103 ("Specified period comes after planning finish") typically occurs in the context of Material Requirements Planning (MRP) or production planning when a user attempts to perform an action (like creating a production order or a purchase requisition) for a period that is beyond the defined planning horizon.
Cause:
- Planning Horizon Exceeded: The specified period for the operation (e.g., production order, purchase requisition) is beyond the planning finish date set in the system.
- Configuration Settings: The planning finish date may be configured in the MRP settings, and the user is trying to plan for a date that is not allowed.
- Incorrect Date Entry: The user may have mistakenly entered a date that is outside the acceptable range.
Solution:
- Check Planning Horizon: Review the planning horizon settings in the MRP configuration. You can do this by navigating to the relevant configuration settings in the SAP system (usually found in the SPRO transaction under MRP settings).
- Adjust Dates: If the date entered is incorrect, correct it to fall within the planning horizon.
- Extend Planning Horizon: If necessary, consider extending the planning horizon in the configuration settings to allow for planning beyond the current limits.
- Review MRP Parameters: Ensure that the MRP parameters are set correctly for the materials in question. This includes checking the MRP type, lot size, and other relevant settings.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the configuration of planning horizons and MRP settings.
Related Information:
By following these steps, you should be able to resolve the MA103 error and continue with your planning activities in SAP.
Get instant SAP help. Start your 7-day free trial now.
MA102
Specified period comes before planning start
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA101
Enter one date only
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA104
Enter at least one date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
MA105
Period already in table
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.