Message type: E = Error
Message class: M6 - Purchasing: General Messages
Message number: 010
Message text: No multilevel structured articles allowed in ME21
You want to create/change a purchase order using ME21/ME22 and have
assigned a multilevel structured article (&V1&).
The system cannot process articles with a two-level bill of material in
transaction ME21/ME22, for example, a display that contains a full
product.
Use transaction ME21N/ME22N/MEPO to create purchase orders that contain
multilevel structured articles.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
M6010
- No multilevel structured articles allowed in ME21 ?The SAP error message M6010 "No multilevel structured articles allowed" typically occurs when you are trying to create a purchase order (PO) using transaction ME21N for a material that is defined as a multilevel structured article (also known as a configurable material or a material with variants). This type of material cannot be directly used in certain purchasing transactions, including the creation of purchase orders.
Cause: Material Type: The material you are trying to use is defined as a multilevel structured article in the material master. This means it is a configurable material that requires specific configurations or variants to be selected before it can be procured. Transaction Limitations: The transaction ME21N does not support the direct use of multilevel structured articles without specifying the necessary configuration or variant.
Solution: To resolve this error, you can take the following steps: Check Material Configuration: Ensure that you are using the correct material number and that it is indeed
Get instant SAP help. Sign up for our Free Essentials Plan.
M6009
Scheduling agreements do not support full products
What causes this issue? You want to create a scheduling agreement and have assigned a full product (&V1&).System Response The system cannot ...
M6008
Scheduling agreements do not support multilevel structured articles
What causes this issue? You want to create a scheduling agreement and have assigned a multilevel structured article (&V1&).System Response T...
M6026
Supplier &1 is blocked for company code &2
What causes this issue? Supplier & is blocked for company code &.System Response The master record for this supplier is blocked for processi...
M6027
Supplier & is blocked for all company codes
What causes this issue? Supplier & is blocked for all company codes.System Response The master record for this supplier is blocked for processin...
Click on this link to search all SAP messages.