Message type: E = Error
Message class: M3 - Material Master
Message number: 594
Message text: With time-phased materials planning, MRP lot size & is not allowed
The MRP type for <DS:GLOS.time-phased_materials_planning>time-phased
materials planning</> is assigned to the material. However, with
time-phased materials planning, only the following lot sizes are
allowed:
lot-for-lot order quantity
fixed lot size
optimum lot size
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Please specify a valid MRP lot size.
Error message extract from SAP system. Copyright SAP SE.
M3594
- With time-phased materials planning, MRP lot size & is not allowed ?The SAP error message M3594 indicates that there is an issue with the configuration of materials planning, specifically related to the use of time-phased materials planning (also known as MRP) and the lot size settings for a material. This error typically arises when the system detects a conflict between the lot size settings and the time-phased planning approach.
Cause: Lot Size Configuration: The material may have a lot size configuration that is incompatible with time-phased planning. For example, if the lot size is set to a fixed quantity or a specific lot size type that does not allow for time-phased planning, this error will occur. MRP Type: The MRP type assigned to the material may not support time-phased planning. For instance, if the MRP type is set to "PD" (MRP) but the lot size is not compatible with the planning strategy, it can lead to this error. Planning Strategy: The planning strategy assigned to
Get instant SAP help. Sign up for our Free Essentials Plan.
M3593
Enter either a rounding value or rounding profile
What causes this issue? You have entered both a rounding value and a rounding profile.System Response This input combination is not allowed since it...
M3592
For batch & there is no valuation record in plant &
What causes this issue? Plant-specific master data for a batch is to be imported or processed. This is only possible if a batch valuation record exis...
M3595
With time-phased materials planning, enter a planning cycle
What causes this issue? You have selected MRP procedure "time-phased materials planning". This procedure requires a planning cycle in the f...
M3596
Plannning cycle & is not allowed for plant &
What causes this issue? The delivery cycle specified is assigned neither to the current plant nor to its reference plant.System Response The system ...