Do you have any question about this error?
Message type: E = Error
Message class: M3 - Material Master
Message number: 596
Message text: Plannning cycle & is not allowed for plant &
The delivery cycle specified is assigned neither to the current plant
nor to its reference plant.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Please correct the delivery cycle.
Error message extract from SAP system. Copyright SAP SE.
M3596
- Plannning cycle & is not allowed for plant & ?The SAP error message M3596 indicates that a planning cycle is not allowed for a specific plant. This error typically arises in the context of Material Requirements Planning (MRP) or Production Planning (PP) when there is an attempt to execute a planning run that is not configured correctly for the specified plant.
Cause:
- Planning Cycle Not Defined: The planning cycle you are trying to use may not be defined for the specified plant in the configuration settings.
- Plant-Specific Settings: The planning cycle may be restricted to certain plants, and the plant you are working with is not included in that configuration.
- Master Data Issues: There may be issues with the master data for the material or plant, such as missing or incorrect planning parameters.
- Authorization Issues: The user may not have the necessary authorizations to execute the planning cycle for that plant.
Solution:
Check Planning Cycle Configuration:
- Go to the configuration settings in SAP (Transaction code: SPRO).
- Navigate to the relevant section for planning cycles and ensure that the planning cycle is defined for the specific plant.
- If it is not defined, you may need to create or modify the planning cycle to include the plant.
Review Plant-Specific Settings:
- Ensure that the planning cycle is correctly assigned to the plant in the material master or in the planning configuration.
- Check the MRP views of the material master for the plant to ensure that the planning cycle is correctly assigned.
Verify Master Data:
- Check the material master data for the relevant material in the specified plant.
- Ensure that all necessary fields related to planning are filled out correctly.
Check User Authorizations:
- Ensure that the user executing the planning run has the necessary authorizations to perform the action for the specified plant.
Consult Documentation:
- Refer to SAP documentation or help resources for more detailed information on planning cycles and their configuration.
Related Information:
Transaction Codes:
SAP Notes: Check for any relevant SAP Notes that may address specific issues related to planning cycles and error M3596.
Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
By following these steps, you should be able to identify the cause of the error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
M3595
With time-phased materials planning, enter a planning cycle
What causes this issue? You have selected MRP procedure "time-phased materials planning". This procedure requires a planning cycle in the f...
M3594
With time-phased materials planning, MRP lot size & is not allowed
What causes this issue? The MRP type for <DS:GLOS.time-phased_materials_planning>time-phased materials planning</> is assigned to the mat...
M3597
The reference material has the period indicator &
What causes this issue? You have assigned a reference material for consumption to this material. The reference material must have the same <DS:GLO...
M3598
The reference material has the fiscal year variant &
What causes this issue? You have assigned a reference material for consumption to this material. The reference material must have the same fiscal yea...
Click on this link to search all SAP messages.