Do you have any question about this error?
Message type: E = Error
Message class: M3 - Material Master
Message number: 411
Message text: Profit center & not defined in plant
Error message extract from SAP system. Copyright SAP SE.
M3411
- Profit center & not defined in plant ?The SAP error message M3411 ("Profit center & not defined in plant") typically occurs when there is an attempt to post a transaction that involves a profit center that is not assigned to the specified plant in the system. This can happen in various modules, such as Materials Management (MM) or Controlling (CO), where profit centers are used for reporting and analysis.
Cause:
- Missing Assignment: The profit center is not assigned to the plant in the configuration settings.
- Incorrect Profit Center: The profit center being used in the transaction is incorrect or does not exist in the system.
- Data Entry Error: There may be a typographical error in the profit center or plant code during data entry.
Solution:
To resolve the M3411 error, you can follow these steps:
Check Profit Center Assignment:
- Go to the transaction code
OKB9
(or use the menu path: Accounting > Controlling > Profit Center Accounting > Master Data > Profit Center > Assign Profit Center to Controlling Area).- Verify that the profit center is assigned to the correct controlling area and that it is valid for the plant in question.
Assign Profit Center to Plant:
- Use transaction code
OX19
(or navigate to the menu path: Logistics > General > Master Data > Profit Center > Assign Profit Center to Plant).- Ensure that the profit center is assigned to the relevant plant. If it is not, you will need to create the assignment.
Verify Data Entry:
- Double-check the transaction data for any typographical errors in the profit center or plant fields.
- Ensure that the profit center being used is active and valid.
Consult with Configuration Team:
- If you do not have the necessary permissions to make changes, consult with your SAP configuration team or system administrator to ensure that the necessary assignments are made.
Testing:
- After making the necessary changes, try to reprocess the transaction that generated the error to confirm that the issue has been resolved.
Related Information:
OKB9
, OX19
, and others related to profit center accounting and plant assignments.By following these steps, you should be able to resolve the M3411 error and ensure that profit centers are correctly defined for the relevant plants in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
M3410
Profit center & not defined
INCLUDE NA_WERTError message extract from SAP system. Copyright SAP SE. ...
M3409
Company code & for material & not maintained
What causes this issue? You have called up material &V2&, but the material master record does not exist for company code &V1&.System ...
M3412
Error in checking profit center &
What causes this issue? There is an error in the current program.System Response The system issues an error message and will not allow you to contin...
M3413
Costing lot size will be the same as the price unit
What causes this issue? You have chosen a costing lot size that is smaller than the price unit. However, the costing lot size must be at least as lar...
Click on this link to search all SAP messages.