Do you have any question about this error?
Message type: E = Error
Message class: M3 - Material Master
Message number: 412
Message text: Error in checking profit center &
There is an error in the current program.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
INCLUDE NA_SYSTVERW1
Note for systems administration
The function module KE_PROFIT_CENTER_CHECK has been called up with an
incorrect parameter combination.
Error message extract from SAP system. Copyright SAP SE.
M3412
- Error in checking profit center & ?The SAP error message M3412, which states "Error in checking profit center &," typically occurs during the processing of a transaction that involves profit center accounting. This error indicates that there is an issue with the profit center specified in the transaction, which could be due to various reasons.
Causes of M3412 Error
Invalid Profit Center: The profit center specified in the transaction may not exist in the system or may have been deleted.
Profit Center Not Active: The profit center might be inactive or not assigned to the relevant controlling area.
Master Data Issues: There could be issues with the master data related to the profit center, such as missing or incorrect configurations.
Authorization Issues: The user may not have the necessary authorizations to access the specified profit center.
Period Closure: The period in which the transaction is being processed may be closed, preventing any changes or postings to that profit center.
Solutions to M3412 Error
Check Profit Center Validity:
- Verify that the profit center exists in the system. You can do this by navigating to the profit center master data in SAP (Transaction Code: KE51 or KE52).
Activate Profit Center:
- Ensure that the profit center is active and assigned to the correct controlling area. You can check this in the profit center master data.
Review Master Data:
- Check the master data for the profit center to ensure that all necessary information is correctly maintained.
Authorization Check:
- Ensure that the user has the necessary authorizations to access and post to the specified profit center. This may involve checking user roles and authorizations in the system.
Check Period Status:
- Verify if the posting period is open. If the period is closed, you may need to open it or post the transaction in an open period.
Consult with Finance Team:
- If the issue persists, consult with your finance or controlling team to ensure that all configurations related to profit centers are correct.
Related Information
Transaction Codes:
SAP Notes: Check SAP Notes for any known issues or patches related to this error message. You can search for M3412 in the SAP Support Portal.
Documentation: Review SAP documentation related to Profit Center Accounting for more detailed information on how profit centers are managed and configured.
If the error persists after checking the above points, it may be beneficial to engage with SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
M3411
Profit center & not defined in plant
INCLUDE NA_WERTEKOMBError message extract from SAP system. Copyright SAP SE. ...
M3410
Profit center & not defined
INCLUDE NA_WERTError message extract from SAP system. Copyright SAP SE. ...
M3413
Costing lot size will be the same as the price unit
What causes this issue? You have chosen a costing lot size that is smaller than the price unit. However, the costing lot size must be at least as lar...
M3414
Competitor & not defined
What causes this issue? The SAP system manages competitors as customers that belong to a particular account group. The account group defines internal...
Click on this link to search all SAP messages.