How To Fix LTRM_EGO005 - Capacity problem: Target PnD ( Node &1 ) has no available capacity


SAP Error Message - Details

  • Message type: E = Error

  • Message class: LTRM_EGO - Messages for ltrm_egos

  • Message number: 005

  • Message text: Capacity problem: Target PnD ( Node &1 ) has no available capacity

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message LTRM_EGO005 - Capacity problem: Target PnD ( Node &1 ) has no available capacity ?

    The SAP error message LTRM_EGO005 indicates a capacity problem in the Logistics Transportation Management (TM) module. Specifically, it means that the target Production Node (PnD) identified by the node number &1 does not have any available capacity to accommodate the planned transportation or production activities.

    Cause:

    1. Capacity Constraints: The target node may have reached its maximum capacity for the specified time period. This can happen if there are too many planned orders, production orders, or transportation requests scheduled for that node.
    2. Incorrect Capacity Settings: The capacity settings for the node may not be configured correctly, leading to an underestimation of available capacity.
    3. Resource Allocation: Resources (like machines, labor, etc.) associated with the node may be allocated to other tasks, leaving no capacity available for new requests.
    4. Time Period Issues: The time period for which the capacity is being checked may not align with the planned activities, leading to a perceived lack of capacity.

    Solution:

    1. Check Capacity Planning: Review the capacity planning for the target node. Ensure that the capacity settings are correctly defined and that they reflect the actual capabilities of the node.
    2. Adjust Production/Transportation Plans: If the node is indeed at full capacity, consider adjusting the production or transportation plans. This could involve rescheduling orders or redistributing tasks to other nodes with available capacity.
    3. Increase Capacity: If feasible, increase the capacity of the node by adding resources or extending working hours.
    4. Review Resource Allocation: Check the allocation of resources to ensure that they are not over-committed. Reallocate resources if necessary to free up capacity.
    5. Analyze Time Periods: Ensure that the time periods for which capacity is being checked align with the planned activities. Adjust the planning horizon if needed.

    Related Information:

    • Transaction Codes: You may use transaction codes like /SCMTMS/PLANNING or /SCMTMS/ORDER to analyze and manage transportation and production orders.
    • Capacity Evaluation Reports: Utilize capacity evaluation reports in SAP to get insights into the current capacity utilization and identify bottlenecks.
    • SAP Notes: Check for any relevant SAP Notes or documentation that may provide additional insights or solutions related to this error message.
    • Consult Documentation: Refer to the SAP Help Portal for detailed documentation on capacity planning and management in SAP TM.

    By following these steps, you should be able to identify the root cause of the capacity issue and implement a suitable solution to resolve the error message LTRM_EGO005.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author