How To Fix LD037 - The &1 &2 takt &3 for material &4 has been changed


SAP Error Message - Details

  • Message type: E = Error

  • Message class: LD - Logistics Automotive Line Design

  • Message number: 037

  • Message text: The &1 &2 takt &3 for material &4 has been changed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message LD037 - The &1 &2 takt &3 for material &4 has been changed ?

    The SAP error message LD037 indicates that the takt time for a specific material has been changed. This message typically arises in the context of production planning and control, particularly when dealing with production scheduling and the configuration of work centers.

    Cause:

    The error message LD037 is triggered when there is a discrepancy or change in the takt time for a material that is being processed. This can happen due to various reasons, such as:

    • Changes in production requirements or processes.
    • Updates to the material master data.
    • Changes in the work center or routing that affect the takt time.
    • Manual adjustments made by users in the production planning module.

    Solution:

    To resolve the LD037 error, you can take the following steps:

    1. Check the Material Master Data:

      • Go to the material master record for the affected material (transaction code MM03).
      • Verify the takt time settings in the relevant views (e.g., Work Scheduling view).
    2. Review Work Center Settings:

      • Check the work center associated with the material (transaction code CR01 or CR02).
      • Ensure that the takt time is correctly defined and matches the production requirements.
    3. Examine Routing:

      • Review the routing for the material (transaction code CA03).
      • Ensure that the operations and their respective times are correctly defined.
    4. Analyze Production Orders:

      • If the error occurs during the processing of a production order, check the order details (transaction code CO03).
      • Look for any inconsistencies in the order that may be causing the error.
    5. Consult Change Logs:

      • Check the change logs for the material, work center, or routing to identify when and why the takt time was changed.
    6. Communicate with Stakeholders:

      • If the change was intentional, communicate with the relevant stakeholders (e.g., production planners, engineers) to ensure that everyone is aware of the updated takt time and its implications.
    7. Adjust Production Planning:

      • If necessary, adjust the production planning parameters to align with the new takt time.

    Related Information:

    • Takt Time: Takt time is the amount of time available to produce a product in order to meet customer demand. It is calculated based on the available production time divided by the customer demand.
    • Production Planning (PP): This module in SAP is responsible for planning and controlling the manufacturing processes, including scheduling, capacity planning, and material requirements planning.
    • Error Handling: Familiarize yourself with common error messages in SAP and their resolutions to streamline troubleshooting processes.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP documentation for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.