How To Fix LD036 - Scheduling work center defined is not valid


LD036 - Overview

  • Message type: E = Error

  • Message class: LD - Logistics Automotive Line Design

  • Message number: 036

  • Message text: Scheduling work center defined is not valid

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message LD036 - Scheduling work center defined is not valid ?
    The SAP error message LD036, which states "Scheduling work center defined is not valid," typically occurs in the context of production planning and scheduling. This error indicates that the work center specified in the scheduling process is either not defined correctly or is not valid for the operation being processed.
    Causes of LD036 Error
    
    Invalid Work Center: The work center specified in the routing or production order does not exist or has been deleted.
    Inactive Work Center: The work center may be inactive or not available for the period in which the scheduling is being attempted.
    Incorrect Configuration: The work center may not be properly configured in terms of capacity, scheduling parameters, or other relevant settings.
    Missing Master Data: Required master data for the work center, such as capacity or cost center, may be missing or incorrectly set up.
    Plant Assignment: The work center may not be assigned to the correct plant or may not be

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant