Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: LB - Logistics: Batch - Management
Message number: 116
Message text: Please first maintain the base unit of measure for material &
You have not yet defined a <DS:DE.MEINS>base unit of measure</> for
material &V1&.
It is only possible to maintain proportion or product units if the base
unit of measure is known.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Please first define the base unit of measure.
Error message extract from SAP system. Copyright SAP SE.
LB116
- Please first maintain the base unit of measure for material & ?The SAP error message LB116, which states "Please first maintain the base unit of measure for material &," typically occurs when you are trying to perform an operation related to a material that does not have a base unit of measure defined in the system. This can happen in various transactions, such as when creating or changing material master records, or when trying to perform inventory management tasks.
Cause:
- Missing Base Unit of Measure: The primary cause of this error is that the material master record for the specified material does not have a base unit of measure defined.
- Incorrect Material Type: The material type may not be set up correctly, or the material may not be configured to allow for a base unit of measure.
- Data Inconsistency: There may be inconsistencies in the material master data that prevent the system from recognizing the base unit of measure.
Solution:
To resolve this error, you need to maintain the base unit of measure for the affected material. Here are the steps to do this:
Access Material Master:
- Go to the transaction code
MM02
(Change Material) orMM01
(Create Material) in SAP.Enter Material Number:
- Input the material number that is causing the error.
Select Views:
- Choose the appropriate views to maintain (usually the Basic Data view).
Maintain Base Unit of Measure:
- In the Basic Data view, find the field for the Base Unit of Measure.
- Enter the appropriate unit of measure (e.g., EA for each, KG for kilograms, etc.).
Save Changes:
- After entering the base unit of measure, save the changes to the material master record.
Re-attempt the Operation:
- Go back to the transaction that triggered the error and try to perform the operation again.
Related Information:
MM02
(Change Material), MM01
(Create Material), and MM03
(Display Material) for managing material master data.If you continue to experience issues after maintaining the base unit of measure, it may be necessary to check for additional configuration settings or consult with your SAP support team for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
LB115
Scheduling of changes for proportion/product units is not supported
What causes this issue? You want to schedule changes to a material master record, or schedule the creation of a material master record on a certain d...
LB114
You cannot delete proportion or product unit & here
What causes this issue? You want to delete <DS:DE.LRMEI_WS>proportion or product unit</> &V1&. This is not possible on this scree...
LB117
Characteristic & is no longer valid => &
What causes this issue? The <DS:GLOS.Characteristic>characteristic</> &V1& is not allowed for proportion or product units. This i...
LB118
All values in accordance with template & are allowed for characteristic &
What causes this issue? No target interval in the material is maintained for characteristic &V1&. All entries that correspond with template &...
Click on this link to search all SAP messages.