How To Fix LB115 - Scheduling of changes for proportion/product units is not supported


SAP Error Message - Details

  • Message type: E = Error

  • Message class: LB - Logistics: Batch - Management

  • Message number: 115

  • Message text: Scheduling of changes for proportion/product units is not supported

  • Show details Hide details
  • What causes this issue?

    You want to schedule changes to a material master record, or schedule
    the creation of a material master record on a certain date in the
    future.
    Maintaining the proportion or product units for these functions is not
    supported.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message LB115 - Scheduling of changes for proportion/product units is not supported ?

    The SAP error message LB115 ("Scheduling of changes for proportion/product units is not supported") typically occurs in the context of production planning and scheduling when there are issues related to the handling of proportion or product units in the system. This error can arise in various scenarios, such as during the creation of production orders, when trying to schedule changes, or when working with specific types of materials.

    Cause:

    The error is generally caused by one of the following reasons:

    1. Incompatible Unit of Measure: The system may not support scheduling changes for materials that are defined with proportion or product units. This can happen if the material master is set up incorrectly or if the unit of measure is not compatible with the scheduling process.

    2. Configuration Issues: There may be configuration settings in the material master or in the production planning settings that do not allow for the scheduling of changes for certain types of units.

    3. Material Type Restrictions: Certain material types may have restrictions on how they can be scheduled, particularly if they are set up for specific production processes.

    4. Versioning Issues: If there are multiple versions of a product or if the product is undergoing changes, the system may not be able to handle the scheduling of these changes properly.

    Solution:

    To resolve the LB115 error, you can take the following steps:

    1. Check Material Master Settings:

      • Go to the material master record (transaction code MM03) and verify the unit of measure settings. Ensure that the units of measure are correctly defined and compatible with the scheduling process.
    2. Review Production Order Settings:

      • Check the production order settings and ensure that the order type and material type are configured correctly. Make sure that the order type allows for the scheduling of changes.
    3. Adjust Configuration:

      • If necessary, consult with your SAP configuration team to review the settings related to production planning and scheduling. They may need to adjust the configuration to allow for the scheduling of changes for the specific material or product units.
    4. Consult Documentation:

      • Review SAP documentation or notes related to this error message. There may be specific notes or patches available that address this issue.
    5. Testing:

      • After making changes, perform testing to ensure that the error no longer occurs and that the scheduling process works as expected.
    6. Contact SAP Support:

      • If the issue persists after trying the above solutions, consider reaching out to SAP support for further assistance. They may provide additional insights or solutions based on your specific system configuration.

    Related Information:

    • Transaction Codes: MM03 (Display Material), CO01 (Create Production Order), CO02 (Change Production Order).
    • SAP Notes: Check for relevant SAP Notes in the SAP Support Portal that may address this specific error.
    • Documentation: Review SAP Help documentation for production planning and scheduling to understand the requirements and limitations related to units of measure.

    By following these steps, you should be able to identify the cause of the LB115 error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker