Do you have any question about this error?
Message type: E = Error
Message class: LB - Logistics: Batch - Management
Message number: 111
Message text: Please save your changes before you maintain further units of measure
You have deleted all proportion or product units in the current
transaction.
For technical reasons, it is no longer possible to maintain proportion
or product units within this transaction.
Save your changes before you maintain further proportion or product
units.
Error message extract from SAP system. Copyright SAP SE.
LB111
- Please save your changes before you maintain further units of measure ?The SAP error message LB111 ("Please save your changes before you maintain further units of measure") typically occurs when you are trying to maintain or change units of measure in a transaction or screen where unsaved changes exist. This is a common issue in SAP when the system requires that all changes be saved before proceeding with additional modifications.
Cause:
The error is triggered because:
- You have made changes to the data in the current session that have not yet been saved.
- The system does not allow you to make further changes (like maintaining units of measure) until the current changes are saved.
Solution:
To resolve this error, you can follow these steps:
Save Your Changes:
- If you have made changes to the data, save them by clicking the "Save" button (usually represented by a disk icon) or by using the keyboard shortcut (often Ctrl + S).
Check for Required Fields:
- Ensure that all required fields are filled out correctly before saving. If there are any validation errors, the system will not allow you to save.
Review Changes:
- If you do not want to save the changes, you can choose to discard them. This can usually be done by navigating back or using the "Back" button, but be cautious as this will lose any unsaved work.
Reopen the Transaction:
- If the issue persists, you can try closing the transaction and reopening it to start fresh.
Consult Documentation:
- If you are unsure about the changes you are making, refer to the relevant SAP documentation or consult with a colleague or SAP support for guidance.
Related Information:
By following these steps, you should be able to resolve the LB111 error and continue with your work in SAP.
Get instant SAP help. Start your 7-day free trial now.
LB110
Planned value & cannot be displayed as numer./denom. (proposal: &)
What causes this issue? The system must be able to store the <DS:DE.ATWRT_WS>planned value</> for a proportion or product unit as <DS:...
LB109
Planned value & is not allowed for characteristic &
What causes this issue? The planned value &V1& you entered is not valid for characteristic &V2&. The planned value for characteristic...
LB112
Assign batch class &2 to material &1
What causes this issue? You have defined proportion or product units for material &V1&. However, the allocation of <DS:GLOS.Class>batch...
LB113
The batch class of material & was changed from & to &
What causes this issue? You have defined the proportion or product units for material &V1&. However, the <DS:GLOS.Class>batch class<...
Click on this link to search all SAP messages.