Do you have any question about this error?
Message type: E = Error
Message class: LB - Logistics: Batch - Management
Message number: 110
Message text: Planned value & cannot be displayed as numer./denom. (proposal: &)
The system must be able to store the <DS:DE.ATWRT_WS>planned value</>
for a proportion or product unit as <DS:TX.MENGENUMRECHNUNG>numerator
and denominator for the conversion</> to <DS:DE.MEINS>base unit of
measure</>.
The planned value &V1& that you entered cannot be represented using
numerator and denominator.
The next possible planned value is &V2&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Change the planned value to one that is valid.
Error message extract from SAP system. Copyright SAP SE.
LB110
- Planned value & cannot be displayed as numer./denom. (proposal: &) ?The SAP error message LB110, which states "Planned value & cannot be displayed as numer./denom. (proposal: &)," typically occurs in the context of SAP's logistics and production planning modules. This error indicates that there is an issue with the planned value that is being processed, specifically that it cannot be represented as a numerator/denominator format.
Cause:
- Data Type Issues: The planned value may not be in a format that SAP can interpret as a number. This could be due to incorrect data entry or formatting issues.
- Missing or Incorrect Configuration: The configuration settings for the relevant planning area or master data may be incorrect or incomplete.
- Invalid Calculation: The planned value may result from a calculation that leads to a division by zero or other invalid mathematical operations.
- Currency Issues: If the planned value involves currency conversion, there may be issues with exchange rates or currency settings.
Solution:
- Check Data Entry: Review the planned value entries to ensure they are correctly formatted as numbers. Look for any non-numeric characters or incorrect decimal placements.
- Review Configuration: Check the configuration settings in the relevant planning area. Ensure that all necessary settings are correctly defined and that master data is complete.
- Validate Calculations: If the planned value is derived from calculations, validate the formulas and ensure that they do not lead to invalid results (e.g., division by zero).
- Currency Settings: If applicable, verify that currency settings and exchange rates are correctly configured and that the planned values are in the expected currency format.
- Debugging: If the issue persists, consider using debugging tools in SAP to trace the source of the error and identify where the planned value is being incorrectly processed.
Related Information:
MD04
(Stock/Requirements List) or MD61
(Create Planned Independent Requirements) to see where the error is occurring.If the problem continues after trying these solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth assistance.
Get instant SAP help. Start your 7-day free trial now.
LB109
Planned value & is not allowed for characteristic &
What causes this issue? The planned value &V1& you entered is not valid for characteristic &V2&. The planned value for characteristic...
LB108
Maintain sort & &
What causes this issue? You have not assigned a sort number to one or more proportion or product units.System Response The system issues an error me...
LB111
Please save your changes before you maintain further units of measure
What causes this issue? You have deleted all proportion or product units in the current transaction.System Response For technical reasons, it is no ...
LB112
Assign batch class &2 to material &1
What causes this issue? You have defined proportion or product units for material &V1&. However, the allocation of <DS:GLOS.Class>batch...
Click on this link to search all SAP messages.