How To Fix LB019 - First explosion level reached


LB019 - Overview

  • Message type: E = Error

  • Message class: LB - Logistics: Batch - Management

  • Message number: 019

  • Message text: First explosion level reached

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message LB019 - First explosion level reached ?
    The SAP error message LB019: First explosion level reached typically occurs in the context of Material Requirements Planning (MRP) or when working with bills of materials (BOMs) in SAP. This message indicates that the system has reached the first level of the BOM explosion, which means that it has identified the components required for the first level of the assembly or product.
    
    Cause: BOM Structure: The error may arise if the BOM structure is not properly defined. This could include missing components or incorrect hierarchy levels. Material Master Data: Issues with the material master data, such as missing or incorrect information, can lead to this error. MRP Settings: Incorrect settings in the MRP configuration can also trigger this message. Routing Issues: If the routing for the production process is not correctly defined, it may lead to this error.
    Solution: Check BOM: Verify the BOM for the material in question. Ensure that all components are correctly defined and

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author