Do you have any question about this error?
Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 559
Message text: Cost center/activity type &1 &2 not allocated through template in actual
Activity type &V2& is allocated in actual by cost center &V1& to the
receiver object &V2&, not via the template. This is attached to
template &V4& as documentation.
The R/3 System sets the quantity for all periods to zero.
Error message extract from SAP system. Copyright SAP SE.
KW559
- Cost center/activity type &1 &2 not allocated through template in actual ?The SAP error message KW559 indicates that a specific cost center and activity type combination is not allocated through a template in the actual data. This typically occurs in the context of Activity-Based Costing (ABC) or when dealing with cost allocations in SAP Controlling (CO).
Cause:
- Missing Allocation Template: The allocation template that is supposed to allocate costs to the specified cost center and activity type is either not defined or not active for the current period.
- Incorrect Configuration: The configuration settings for the allocation process may not include the specified cost center or activity type.
- Period Closing: The period may be closed, preventing any new allocations from being processed.
- Data Entry Errors: There may be errors in the data entry or in the master data setup for the cost center or activity type.
Solution:
Check Allocation Template:
- Go to the allocation template configuration in SAP and verify that the template includes the specified cost center and activity type.
- Ensure that the template is active for the current period.
Review Configuration:
- Check the configuration settings in the SAP Controlling module to ensure that the cost center and activity type are correctly set up for allocations.
- Make sure that the allocation structure includes the necessary elements.
Open Period:
- If the period is closed, you may need to reopen it to allow for the allocation to be processed. This should be done with caution and in accordance with your organization's policies.
Correct Master Data:
- Verify the master data for the cost center and activity type to ensure that they are correctly defined and active.
- Make any necessary corrections to the master data.
Consult Documentation:
- Review SAP documentation or help resources for additional guidance on allocation templates and error messages.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
KSU5
(for actual assessments) or KSV5
(for actual distributions) to review and manage allocations.By following these steps, you should be able to identify the cause of the KW559 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KW558
Cost center/activity type &1 &2 not allocated through template in plan.
What causes this issue? Activity type &V2& is allocated in plan by cost center &V1& to the receiver object &V2&, not via the ...
KW557
Business process &1 not allocated through a template in actual
What causes this issue? Process &V1& is not allocated in actual via the template to the receiver object &V2&. This is attached to tem...
KW560
Position the cursor on an object with template allocation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KW561
Select at least one task type
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.