Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 101
Message text: Application area CO-ABC is not active
The Activity-Based Costing (CO-ABC) component is not active for
controlling area <ZH>&V2&</> and fiscal year <ZH>&V1&</>.
No Activity-Based Costing function can be performed
Check whether the required controlling area is set correctly.
Check whether the controlling area is defined correctly:
If required, activate the Activity-Based Costing component in the
'control indicators' of the controlling area for the fiscal year in
question.
Is the fiscal year or are the fiscal years defined for the controlling
area at all?
Does the controlling area have a standard hierarchy for business
processes?
Maintain the components for controlling area &V2& for fiscal year &V1&.
Start planning again.
Error message extract from SAP system. Copyright SAP SE.
KW101
- Application area CO-ABC is not active ?The SAP error message KW101, which states "Application area CO-ABC is not active," typically occurs when you are trying to access or use functionality related to Activity-Based Costing (ABC) in the Controlling (CO) module, but the necessary application area is not activated in your SAP system.
Cause: Inactive Application Area: The CO-ABC application area is not activated in the system. This can happen if the system configuration has not been completed or if the application area has been intentionally deactivated. Missing Configuration: The necessary configuration settings for Activity-Based Costing may not have been set up correctly. Authorization Issues: Sometimes, the user may not have the necessary authorizations to access the CO-ABC functionalities.
Solution: Activate the Application Area: Go to the transaction code SPRO (SAP Project Reference Object). Navigate to Controlling -> Cost Center Accounting -> Basic Settings -> Activate Application Areas. Ensure that the CO-ABC application area is activated. Check Configuration: Ensure that all necessary configuration steps for Activity-Based Costing have
Get instant SAP help. Sign up for our Free Essentials Plan.
KW100
**** CO-ABC allocation messages
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KW099
This function is not yet available
What causes this issue? The function you have chosen is not yet realized in the system.System Response No further processing is carried out.Error me...
KW102
No activity allocation planned for business process &
What causes this issue? Business process &v1& is not supported for activity allocation.System Response The business process cannot participa...
KW103
Allocation relationships include cycles.
What causes this issue? With the explosion of the process structures, the system found allocation relationships containing loops. The explosion of lo...
Click on this link to search all SAP messages.