Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 100
Message text: **** CO-ABC allocation messages
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KW100
- **** CO-ABC allocation messages ?The SAP error message KW100 is related to CO-ABC (Controlling - Activity-Based Costing) allocation processes. This error typically indicates that there is an issue with the allocation of costs or revenues in the system. Here’s a breakdown of the potential causes, solutions, and related information for this error message: Causes of KW100 Error Missing Master Data: The error may occur if there are missing or incorrect master data records, such as cost centers, activity types, or allocation bases. Incorrect Configuration: The configuration settings for the allocation process may not be set up correctly. This includes settings in the controlling area, cost center accounting, or activity-based costing. Data Inconsistencies: There may be inconsistencies in the data being used for the allocation, such as incorrect or incomplete entries in the allocation structure. Authorization Issues: The user may not have the necessary authorizations to perform the allocation, leading to the error. Technical Issues: There could be technical issues, such
Get instant SAP help. Sign up for our Free Essentials Plan.
KW099
This function is not yet available
What causes this issue? The function you have chosen is not yet realized in the system.System Response No further processing is carried out.Error me...
KW098
Business process &1 locked by user &2.
What causes this issue? DEFINE &USER& = &V2& INCLUDE MESSAGE_ENQUEUE_USER OBJECT DOKU ID TX You want to edit or delete business proce...
KW101
Application area CO-ABC is not active
What causes this issue? The Activity-Based Costing (CO-ABC) component is not active for controlling area <ZH>&V2&</> and fiscal y...
KW102
No activity allocation planned for business process &
What causes this issue? Business process &v1& is not supported for activity allocation.System Response The business process cannot participa...
Click on this link to search all SAP messages.