Do you have any question about this error?
Message type: E = Error
Message class: KV - Variance Analysis for Cost Centers and Cost Objects
Message number: 190
Message text: Reporting point/routing: &. Overhead not calculated
In <DS:GLOS.3526B6DBAFAB52B9E10000009B38F974>Product Cost by Period</>,
<DS:GLOS.3526B774AFAB52B9E10000009B38F974>work in process</> and
<DS:GLOS.359A41323EC34A00E10000009B38F984>scrap variances</> are
calculated by valuating the quantities confirmed at the operations or
<DS:GLOS.3526C41CAFAB52B9E10000009B38F974>reporting points</> with the
<DS:GLOS.3526B75FAFAB52B9E10000009B38F974>target costs</>.
The system uses these target costs to calculate the
<DS:GLOS.3528A1199C0F1940E000080009927D9B>overhead</> for the operation
or reporting point.
In this case the system cannot calculate any overhead.
If this message is issued as an error message (message type E), the
object is flagged as having errors and is added to the worklist.
If this message is issued as an abort message (message type A), the
transaction is terminated.
If this message is issued as a warning message (message type W) or
information message (message type I), the object is processed without
target overhead. The reported target costs will not contain the target
overhead in this case.
You can also suppress the message (message type "blank").
In the standard system, this message is issued as an error message.
If you want to assign the message to another message type, go into
Customizing for Product Cost by Order or Product Cost by Period and use
the user-defined error management functions.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KV190
- Reporting point/routing: &. Overhead not calculated ?The SAP error message KV190, which states "Reporting point/routing: &. Overhead not calculated," typically occurs in the context of production planning and controlling (PP/CO) when the system is unable to calculate overhead costs for a specific reporting point or routing. This can happen for several reasons, and understanding the cause is essential for resolving the issue.
Causes:
Missing Overhead Key: The overhead key may not be assigned to the routing or the operation in question. Overhead keys are used to define how overhead costs are calculated.
Incorrect Configuration: The configuration settings for overhead calculation in the controlling area or plant may not be set up correctly.
Routing Issues: The routing may not be properly defined, or there may be missing or incorrect data in the routing that prevents overhead calculation.
Master Data Issues: There may be issues with the master data, such as missing or incorrect cost center assignments, which can affect overhead calculations.
Costing Variant: The costing variant used may not be configured to include overhead calculations.
Solutions:
Check Overhead Key Assignment:
- Go to the routing or operation in question and verify that an overhead key is assigned. If not, assign the appropriate overhead key.
Review Configuration Settings:
- Check the configuration settings for overhead calculation in the controlling area. Ensure that the settings are correct and that the overhead calculation is activated.
Validate Routing:
- Review the routing for completeness and correctness. Ensure that all necessary operations and components are defined correctly.
Examine Master Data:
- Check the master data for cost centers, work centers, and other relevant entities to ensure that they are correctly set up and linked.
Costing Variant Configuration:
- Review the costing variant being used for the calculation. Ensure that it is configured to include overhead costs.
Run Costing Again:
- After making the necessary adjustments, try running the costing process again to see if the error persists.
Related Information:
CA01
(Create Routing), CA02
(Change Routing), CK11N
(Create Cost Estimate), and CK40N
(Costing Run) to check and modify the relevant data.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in SAP PP/CO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KV189
No overhead could be calculated
What causes this issue? <DS:GLOS.3526B637AFAB52B9E10000009B38F974>Variance calculation</> calculates the <DS:GLOS.3526B75FAFAB52B9E100...
KV188
Cost object & was not found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KV191
Cannot calculate work in process at target costs
What causes this issue? The <DS:GLOS.WIP_calculation>WIP calculation</> process could not determine any <DS:GLOS.work_in_process>wo...
KV192
Cannot calculate scrap variances
What causes this issue? The scrap variances could not be calculated due to an error in the application.What causes this issue? The system issues an ...
Click on this link to search all SAP messages.