Message type: E = Error
Message class: KS - RK-S Master Data Maintenance
Message number: 142
Message text: Value entered is not useable as a planned activity price indicator
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KS142
- Value entered is not useable as a planned activity price indicator ?The SAP error message KS142, which states "Value entered is not usable as a planned activity price indicator," typically occurs in the context of cost planning in SAP Controlling (CO) when you are trying to enter a planned activity price for a cost center or internal order. This error indicates that the value you have entered does not meet the required criteria for a planned activity price. Causes of KS142 Error Invalid Value Format: The value entered may not be in the correct format (e.g., it may contain non-numeric characters or be out of the acceptable range). Missing Configuration: The activity type or cost center may not be properly configured in the system, leading to issues when trying to assign a planned price. Incorrect Activity Type: The activity type you are trying to use may not be valid for the cost center or internal order you are working with. Currency Issues: If the planned activity
Get instant SAP help. Sign up for our Free Essentials Plan.
KS141
Please maintain activity price indicator
What causes this issue? If you are using activity type category "2" (indirectly determined and allocated), you must set the price indicator...
KS140
Values for activity type categories do not match
What causes this issue? The activity type must either be allocatable in the plan and actual or non-allocatable in the plan and actual For example, if...
KS143
Value entered is not useable as an actual activity price indicator
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KS144
Only non-allocatable acitivty type category possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.