How To Fix KQ526 - Costing variant & not suitable for confirmation


KQ526 - Overview

  • Message type: E = Error

  • Message class: KQ - Error Messages for Customizing Product Costing

  • Message number: 526

  • Message text: Costing variant & not suitable for confirmation

  • Show details Hide details
  • What causes this issue?

    The costing variant you entered as a default value for confirmation is
    used for a different purpose than is specified by its costing type and
    valuation variant.
    The following parameters are defined in the costing type:
    The reference object is the object to which the cost estimate refers
    (such as a material, a base planning object, or a production order).
    This parameter is set implicitly when you access Customizing.
    The indicator selected under <LS>Update of order value</> determines
    whether the costing type is used to calculate planned costs or actual
    costs. These indicators can only be maintained in Customizing for
    production orders.
    The valuation variant used by the costing variant for actuals should
    fulfill the following condition:
    In the <LS>Strategy sequence for internal activity</>, no strategy that
    uses averaging of activity prices has priority 1.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Use F4 to choose another costing variant, or define a new costing
    variant with a suitable costing type.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KQ526 - Costing variant & not suitable for confirmation ?
    The SAP error message KQ526, which states that the "Costing variant & not suitable for confirmation," typically occurs in the context of production order confirmations in SAP. This error indicates that the costing variant assigned to the production order is not configured to allow confirmations. Here’s a breakdown of the cause, potential solutions, and related information:
    
    Cause: Costing Variant Configuration: The costing variant assigned to the production order may not be set up to allow confirmations. This can happen if the costing variant is configured for a different purpose or if it lacks the necessary settings for confirmation processes. Production Order Type: The type of production order may not be compatible with the costing variant being used. Missing Settings: There may be missing settings in the controlling area or in the configuration of the costing variant itself.
    Solution: Check Costing Variant Settings: Go to the configuration settings for the costing variant in SAP (Transaction code: OKKN). Ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker