Message type: E = Error
Message class: KQ - Error Messages for Customizing Product Costing
Message number: 290
Message text: RA version &1 relevant for planned settlement - use plan version &2
You have specified that
<DS:GLOS.3526B73EAFAB52B9E10000009B38F974>results analysis version</>
&V1& is relevant for planned settlement. In this case the plan version
used for planned results analysis must have the same number.
Plan version &V2& will be entered when you press Enter.
If you want to use a different plan version &V3& for planned results
analysis under results analysis version &V1&, you can specify that
results analysis version &V1& is not relevant to settlement.
Otherwise you must define a results analysis version &V3& with plan
version &V3&, which you then can specify as relevant to settlement.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KQ290
- RA version &1 relevant for planned settlement - use plan version &2 ?The SAP error message KQ290 indicates an issue related to the planned settlement of a project or internal order. Specifically, it suggests that the system is trying to use a version of the RA (Results Analysis) that is not relevant for the planned settlement process. Here’s a breakdown of the cause, potential solutions, and related information:
Cause: Version Mismatch: The error occurs when the RA version being used is not compatible with the planned settlement version. This can happen if the RA version is not set up correctly or if the wrong version is being referenced in the settlement process.
Configuration Issues: There may be configuration settings in the controlling area or project settings that are not aligned with the versions being used. Missing or Incorrect Data: The necessary data for the planned settlement might be missing or incorrectly entered, leading to the system not recognizing the RA version.
Solution: Check RA Version Configuration: Go to the
Get instant SAP help. Sign up for our Free Essentials Plan.
KQ289
Version &1 in CO area &2 not intended for use as plan version
What causes this issue? In the central version maintenance, version &V1& in controlling area &V2& is not defined as a <DS:GLOS.352...
KQ288
Enter a plan version for planned results analysis
What causes this issue? You have selected the indicator <DS:DE.KKA_VERW_C>Actual and plan RA</>. If you do this, you must enter a plan ve...
KQ291
No CO version exists for updated costs
What causes this issue? No <LS>CO version</> was created for the cost forecast.System Response The system issues an error message and wi...
KQ292
Specified CO version not suitable for updated costs
What causes this issue? The specified CO version is not suitable for the cost forecast.System Response The system issues an error message and will n...
Click on this link to search all SAP messages.