Message type: E = Error
Message class: KQ - Error Messages for Customizing Product Costing
Message number: 289
Message text: Version &1 in CO area &2 not intended for use as plan version
In the central version maintenance, version &V1& in controlling area
&V2& is not defined as a
<DS:GLOS.3526B5EDAFAB52B9E10000009B38F974>Plan version</>.
The system rejects the entry of this plan version.
Use a different plan version, or go into the central version
maintenance for version &V1& in controlling area &V2& and select the
<LS>Plan</> indicator.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KQ289
- Version &1 in CO area &2 not intended for use as plan version ?The SAP error message KQ289 indicates that the version specified in the controlling (CO) area is not intended for use as a plan version. This typically occurs when you are trying to use a version that is not set up correctly for planning purposes in the controlling module.
Cause:
- Version Configuration: The version you are trying to use is not configured as a planning version in the controlling area. In SAP, versions can be set up for different purposes (e.g., actual, plan, forecast), and if a version is not marked as a planning version, you will encounter this error.
- Incorrect Version Number: The version number you are using may be incorrect or does not exist in the specified controlling area.
- Authorization Issues: There may be authorization issues preventing you from accessing the version in the specified CO area.
Solution:
Check Version Configuration:
- Go to the transaction code OKKP (or use the menu path: Controlling -> Master Data -> Versions).
- Check the version settings for the specified controlling area. Ensure that the version you are trying to use is marked as a planning version.
- If it is not set as a planning version, you can create a new version or modify the existing one to enable planning.
Verify Version Number:
- Ensure that the version number you are using is correct and exists in the controlling area you are working with. You can check this in the same transaction (OKKP).
Authorization Check:
- Ensure that you have the necessary authorizations to access the version in the specified CO area. You may need to contact your SAP security administrator to verify your permissions.
Use a Different Version:
- If the version you are trying to use is not intended for planning, consider using a different version that is configured for planning purposes.
Related Information:
Transaction Codes:
SAP Documentation: Refer to the SAP Help Portal for detailed documentation on controlling versions and planning in SAP CO.
SAP Notes: Check for any relevant SAP Notes that may address specific issues related to version management in CO.
By following these steps, you should be able to resolve the KQ289 error and successfully use the appropriate version for planning in your controlling area.
Get instant SAP help. Start your 7-day free trial now.
KQ288
Enter a plan version for planned results analysis
What causes this issue? You have selected the indicator <DS:DE.KKA_VERW_C>Actual and plan RA</>. If you do this, you must enter a plan ve...
KQ287
Plan version and relevance to settlement only relevant with plan RA
What causes this issue? You have entered a <DS:GLOS.3526B5EDAFAB52B9E10000009B38F974>plan version</>, or you have selected the indicator ...
KQ290
RA version &1 relevant for planned settlement - use plan version &2
What causes this issue? You have specified that <DS:GLOS.3526B73EAFAB52B9E10000009B38F974>results analysis version</> &V1& is rel...
KQ291
No CO version exists for updated costs
What causes this issue? No <LS>CO version</> was created for the cost forecast.System Response The system issues an error message and wi...