Message type: E = Error
Message class: KPN - Costing: Networks, Projects
Message number: 069
Message text: Messages during unit costing copying (network &1, activity &2)
Messages were collected while the unit costing for network activity
&V1& &V2&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the messages.
Error message extract from SAP system. Copyright SAP SE.
KPN069
- Messages during unit costing copying (network &1, activity &2) ?The SAP error message KPN069 indicates an issue that occurs during the unit costing copying process for a network activity. This message typically arises when there are inconsistencies or issues with the data being processed in the network or activity.
Cause: The error can be caused by several factors, including: Missing or Incomplete Data: The network or activity may not have all the required data for the costing process. Incorrect Configuration: There may be configuration issues in the costing settings or in the network structure. Locked Objects: The network or activity might be locked by another user or process, preventing the copying of costing data. Inconsistent Data: There may be inconsistencies in the data related to the network or activity, such as missing cost elements or incorrect assignment of resources. Authorization Issues: The user may not have the necessary authorizations to perform the costing operation.
Solution: To resolve the KPN069 error, you can take the following steps: Check Data Completeness:
Get instant SAP help. Sign up for our Free Essentials Plan.
KPN068
Controlling area & does not exist
What causes this issue? The value you have maintained for the CAC parameter in the user parameters for this controlling area does not exist.System Re...
KPN067
Assign a default date category to billing plan type &1
What causes this issue? You want to maintain a template billing plan for billing plan type &V1& . However, no template date category has yet ...
KPN070
Messages during copying of unit costing for component &1
What causes this issue? Messages were collected while the unit costing for material component &V1& &V2&.Procedure for System Administ...
KPN071
A costing for material &2 has already been maintained re WBS el. &1
What causes this issue? Materials in valuated project stock are valued at WBS element, material, and plan level. The value for WBS element &V1&am...
Click on this link to search all SAP messages.