Message type: E = Error
Message class: KPN - Costing: Networks, Projects
Message number: 069
Message text: Messages during unit costing copying (network &1, activity &2)
Messages were collected while the unit costing for network activity
&V1& &V2&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the messages.
Error message extract from SAP system. Copyright SAP SE.
KPN069
- Messages during unit costing copying (network &1, activity &2) ?The SAP error message KPN069 indicates an issue that occurs during the unit costing copying process for a network activity. This message typically arises when there are inconsistencies or issues with the data being processed in the network or activity.
Cause:
The error can be caused by several factors, including:
- Missing or Incomplete Data: The network or activity may not have all the required data for the costing process.
- Incorrect Configuration: There may be configuration issues in the costing settings or in the network structure.
- Locked Objects: The network or activity might be locked by another user or process, preventing the copying of costing data.
- Inconsistent Data: There may be inconsistencies in the data related to the network or activity, such as missing cost elements or incorrect assignment of resources.
- Authorization Issues: The user may not have the necessary authorizations to perform the costing operation.
Solution:
To resolve the KPN069 error, you can take the following steps:
- Check Data Completeness: Ensure that all required data for the network and activity is complete. This includes checking for missing cost elements, resources, and other relevant information.
- Review Configuration: Verify the configuration settings related to costing in the network. Ensure that all necessary settings are correctly defined.
- Unlock Objects: If the network or activity is locked, check with your system administrator to unlock it or to identify the process that is holding the lock.
- Data Consistency Check: Run consistency checks on the network and activity to identify any inconsistencies. You can use transaction codes like CNO1 or CNO2 to check and correct inconsistencies.
- Authorization Check: Ensure that the user performing the operation has the necessary authorizations to access and modify the network and activity data.
- Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message or provide additional troubleshooting steps.
Related Information:
If the problem persists after following these steps, it may be beneficial to involve your SAP support team or consult with SAP directly for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KPN068
Controlling area & does not exist
What causes this issue? The value you have maintained for the CAC parameter in the user parameters for this controlling area does not exist.System Re...
KPN067
Assign a default date category to billing plan type &1
What causes this issue? You want to maintain a template billing plan for billing plan type &V1& . However, no template date category has yet ...
KPN070
Messages during copying of unit costing for component &1
What causes this issue? Messages were collected while the unit costing for material component &V1& &V2&.Procedure for System Administ...
KPN071
A costing for material &2 has already been maintained re WBS el. &1
What causes this issue? Materials in valuated project stock are valued at WBS element, material, and plan level. The value for WBS element &V1&am...
Click on this link to search all SAP messages.