Do you have any question about this error?
Message type: E = Error
Message class: KPN - Costing: Networks, Projects
Message number: 039
Message text: Billing plan type & does not exist
Billing plan type &V1& is not defined in Project System customizing.
Check your entry.
If required, maintain billing plan type &V1& in customizing.
Error message extract from SAP system. Copyright SAP SE.
KPN039
- Billing plan type & does not exist ?The SAP error message KPN039 indicates that the billing plan type specified in the transaction does not exist in the system. This error typically occurs in the context of billing and invoicing processes, particularly when dealing with contracts, sales orders, or service agreements that utilize billing plans.
Cause:
- Incorrect Billing Plan Type: The billing plan type entered in the transaction does not match any of the billing plan types defined in the system.
- Configuration Issues: The billing plan type may not have been configured properly in the system, or it may have been deleted or deactivated.
- Authorization Issues: The user may not have the necessary authorizations to access the billing plan type.
- Data Entry Errors: There may be a typographical error in the billing plan type entered.
Solution:
Check Billing Plan Type:
- Verify the billing plan type you are trying to use. Ensure that it is correctly spelled and formatted.
- You can check the available billing plan types in the configuration settings of SAP.
Configuration Check:
- Go to the configuration settings in SAP (Transaction SPRO) and navigate to the relevant area for billing plan types.
- Ensure that the billing plan type you are trying to use is defined and active.
Create or Modify Billing Plan Type:
- If the billing plan type does not exist, you may need to create it. This typically involves defining the billing plan type in the system with the necessary parameters.
- If it exists but is inactive, you may need to activate it.
User Authorizations:
- Check if the user has the necessary authorizations to access the billing plan type. If not, you may need to adjust the user roles or permissions.
Consult Documentation:
- Refer to SAP documentation or help resources for more detailed instructions on managing billing plan types.
Contact Support:
- If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
SPRO
for configuration, VA01
for creating sales orders, or VA02
for modifying them, depending on the context of the error.By following these steps, you should be able to identify and resolve the KPN039 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
KPN038
Invoicing plan type & does not exist
What causes this issue? Invoicing plan type &V1& is not defined in Project System customizing.How to fix this error? Check your entry. If re...
KPN037
No billing plan types have been maintained
What causes this issue? No invoicing plan type has been maintained in Project System customizing for the network activity or material component.Syste...
KPN040
Select an object
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KPN041
Costed values could not be copied to version &
What causes this issue? You have entered CO version &V1& as the target version. Costed values cannot be copied to CO version &V1&. As...
Click on this link to search all SAP messages.