How To Fix KP253 - Cost center & activity type &: activity taken although activity 0


KP253 - Overview

  • Message type: E = Error

  • Message class: KP - CO-OM Planning

  • Message number: 253

  • Message text: Cost center & activity type &: activity taken although activity 0

  • Show details Hide details
  • Plan activity for cost center &V1&, activity type &V2& is zero.
    However, an activity input was planned for cost center &V3&, activity
    type &V4&.

    System Response

    The SAP System cannot calculate activity prices as this would involve
    division by zero. Activity input planning is threfore ignored in
    activity price calculation.

    How to fix this error?

    Check plan activity price calculation planning for activity type &V2&,
    cost center &V1& and the cost planning.
    <DS:TRAN.KP26>Activity Type Planning</>
    <DS:TRAN.KP17>Primary Cost Planning</>
    For actual activity price calculation, actual costs are allocated onto
    the activity type by splitting, although no activity posting has been
    made to the activity type.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KP253 - Cost center & activity type &: activity taken although activity 0 ?
    The SAP error message KP253 indicates that there is an issue with the assignment of activity types to cost centers in the context of activity-based costing. Specifically, the message states that an activity has been taken into account, but the activity level is zero. This can occur in various scenarios, such as during the execution of a cost center planning transaction or when running a report that involves activity allocation.
    
    Cause: Activity Type Assignment: The activity type may be assigned to the cost center, but there are no actual activities planned or recorded for the specified period. Zero Activity Level: The system is trying to allocate costs based on an activity type that has a planned or actual activity level of zero. Incorrect Planning Data: There may be an issue with the planning data where the activity levels were not entered or were incorrectly set to zero. Cost Center Configuration: The cost center may not

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant