Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 240
Message text: Iterative price calculation terminated
A serious system error occurred during activity price calculation.
Processing is terminated.
Inform your system administrator.
Error message extract from SAP system. Copyright SAP SE.
KP240
- Iterative price calculation terminated ?The SAP error message KP240, which states "Iterative price calculation terminated," typically occurs in the context of product costing, particularly when using the costing variant in the Controlling (CO) module. This error indicates that the iterative price calculation process could not be completed successfully, often due to issues with the data or configuration. Causes of KP240 Error Circular References: The most common cause is circular references in the cost estimates. This can happen if a material is dependent on itself or if there are interdependencies between materials that create a loop. Missing Master Data: Required master data (like BOMs, routings, or cost estimates) may be missing or incorrectly configured. Costing Variant Issues: The costing variant settings may not be correctly defined, leading to issues during the calculation process. Incorrect Configuration: Configuration settings in the controlling area or the costing variant may not align with the requirements of the materials being costed. Data Inconsistencies: Inconsistencies in the
Get instant SAP help. Sign up for our Free Essentials Plan.
KP239
Special periods are not processed
What causes this issue? Period &V1& is a special period in fiscal year variant &V2& of controlling area &V3&. The last standa...
KP238
Select a line in the list
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KP241
Values not updated, because debits and credits have not changed
What causes this issue? You called up iterative activity price calculation with update. However, no change was made to the activity prices or the val...
KP242
Cost center & does not exist, but activities exist for it
What causes this issue? In activity price calculation the SAP System determined activity quantities for cost center &V1&, activity type &...
Click on this link to search all SAP messages.