Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 080
Message text: Revaluation &1 was executed successfully (document numbers &2 - &3)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KP080
- Revaluation &1 was executed successfully (document numbers &2 - &3) ?The SAP error message KP080 indicates that a revaluation process has been executed successfully, and it provides information about the document numbers that were affected by this process. This message is not an error in the traditional sense; rather, it is an informational message indicating that the revaluation has been completed.
Cause:
Since KP080 is an informational message and not an error, there is no specific solution required. However, if you are looking to understand the implications of this message or verify the results of the revaluation, you can take the following steps:
Review the Document Numbers: Check the document numbers provided in the message to see the details of the revaluation entries. You can do this by navigating to the relevant transaction codes (e.g., KSB1 for cost centers or KO03 for internal orders) to view the details of the documents.
Verify Revaluation Results: Ensure that the revaluation has produced the expected results. You can compare the balances before and after the revaluation to confirm that the adjustments are correct.
Check Configuration: If you are unsure about the revaluation process or its configuration, review the settings in the controlling module (CO) to ensure that they align with your organization's accounting policies.
Consult Documentation: If you need more information about the revaluation process, refer to SAP documentation or help resources related to controlling and revaluation processes.
In summary, KP080 is an informational message indicating successful execution of a revaluation process, and no corrective action is needed unless you need to verify the results or understand the process better.
Get instant SAP help. Start your 7-day free trial now.
KP079
Revaluation &1 was executed successfully (document number &2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KP078
Revaluation & was not executed
What causes this issue? The processing of revaluation &V1& had to be terminated. Possible causes are: The system issues an error message and ...
KP081
Revaluation(s) already executed were reversed (documents: &1 - &2)
What causes this issue? First, revaluations already carried out were reversed. Reversal document numbers: &V1& through &V2&System Res...
KP082
Revaluation(s) already executed were reversed (document: &1)
What causes this issue? First, revaluations already carried out were reversed. Reversal document number: &V1&System Response How to fix this ...
Click on this link to search all SAP messages.