Do you have any question about this error?
Message type: E = Error
Message class: KOSA - Product Cost Collector
Message number: 205
Message text: Cost estimate with costing date in the past not allowed
Preliminary cost estimates for product cost collectors cannot be
created for a validity date that is in the past.
No product cost collectors are costed.
As the costing date, choose either the current date or a date in the
future.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KOSA205
- Cost estimate with costing date in the past not allowed ?The SAP error message KOSA205 indicates that a cost estimate is being created or processed with a costing date that is in the past. This is a common issue in SAP when dealing with cost estimates, as the system typically does not allow cost estimates to be created for dates that have already passed.
Cause:
- Costing Date: The costing date specified in the cost estimate is earlier than the current date. This can happen if the user manually enters a past date or if the system defaults to a past date due to configuration or data entry errors.
- Period Closing: The period for the relevant controlling area or company code may have been closed, preventing any cost estimates from being created for that period.
- Configuration Settings: The system settings may restrict cost estimates to be created only for the current or future periods.
Solution:
- Change Costing Date: Ensure that the costing date is set to the current date or a future date. You can do this by editing the cost estimate and entering a valid costing date.
- Check Period Status: Verify if the period for the relevant controlling area is open. If it is closed, you may need to reopen the period or create the cost estimate for a different period.
- Review Configuration: Check the configuration settings in the controlling area to ensure that they allow for cost estimates to be created for the desired periods.
- Use Current Date: If you are unsure about the date to use, it is generally safe to use the current date for cost estimates unless there is a specific reason to use a future date.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or refer to SAP documentation for further troubleshooting steps.
Get instant SAP help. Start your 7-day free trial now.
KOSA204
Costing not possible - routing header unit of measure changed
What causes this issue? You are attempting to create a preliminary cost estimate for a product cost collector of a repetitive manufacturing material....
KOSA203
Error creating prelim. cost est. for product cost collector &1
What causes this issue? Errors occurred while the system was creating the preliminary cost estimate for the product cost collector.System Response T...
KOSA206
No product cost collector was costed
What causes this issue? The system could not find a <DS:GLOS.3526B6F2AFAB52B9E10000009B38F974>product cost collector</> that meets the se...
KOSA207
&1 product cost collectors costed, of which &2 with errors
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.