How To Fix KOSA013 - Run schedule header &1 cannot be deleted


KOSA013 - Overview

  • Message type: E = Error

  • Message class: KOSA - Product Cost Collector

  • Message number: 013

  • Message text: Run schedule header &1 cannot be deleted

  • Show details Hide details
  • What causes this issue?

    The deletion flag for <DS:GLOS.3526C4C0AFAB52B9E10000009B38F974>run
    schedule header</> &V1& cannot be set for the following reasons:
    The <DS:GLOS.3526B763AFAB52B9E10000009B38F974>cutoff period</> for
    <DS:GLOS.3526B772AFAB52B9E10000009B38F974>WIP calculation</> is not set
    for the period of the last
    <DS:GLOS.3526C41DAFAB52B9E10000009B38F974>reporting point backflush</>,
    scrap backflush, or final backflush for the run schedule header.
    The cutoff period for
    <DS:GLOS.3526B637AFAB52B9E10000009B38F974>variance calculation</> is
    not set for the period of the last reporting point backflush, scrap
    backflush, or final backflush for the run schedule header.

    System Response

    The system does not set the deletion flag.

    How to fix this error?

    Make sure that the <DS:GLOS.3526B628AFAB52B9E10000009B38F974>period-end
    closing</> process in <DS:GLOS.3526B6CAAFAB52B9E10000009B38F974>Cost
    Object Controlling</> is executed for the desired cutoff period.
    Then set the cutoff period for WIP calculation or the period lock for
    variance calculation.
    <ZH>Note</>
    Once you have set the cutoff period or period lock for a period, you
    should not withdraw it. Withdrawing the cutoff period or the period
    lock can result in inconsistencies between the values shown on the
    <DS:GLOS.3526B6F2AFAB52B9E10000009B38F974>product cost collector</>
    (such as work in process or variances) and the values calculated before
    the cutoff period or period lock was withdrawn. Such inconsistencies
    can occur if, for example, the deletion flag was set for the run
    schedule headers or
    <DS:GLOS.3526C3D7AFAB52B9E10000009B38F974>manufacturing orders</> that
    should have been included in the period-end closing process for the
    product cost collector.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KOSA013 - Run schedule header &1 cannot be deleted ?
    The SAP error message KOSA013, which states "Run schedule header &1 cannot be deleted," typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with activity-based costing or internal orders. This error indicates that there is an issue preventing the deletion of a run schedule header, which is a part of the scheduling and execution of cost allocations or assessments.
    Causes:
    
    Dependencies: The run schedule header may have dependencies or linked documents that prevent its deletion. For example, if there are already executed or posted allocations associated with the run schedule, it cannot be deleted.
    Status: The run schedule header might be in a status that does not allow deletion. For instance, if it has been processed or is in a locked state, it cannot be removed.
    Authorization Issues: The user attempting to delete the run schedule header may not have the necessary authorizations to perform this action.
    System Configuration: There

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant